20
49-80267 Rev. 4
Installation Instructions
UNDER-CABINET INSTALLATION
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT:
Framing must be capable of supporting
100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ Install a horizontal support at least 1” x 6” between
two wall studs at the mounting screw location. The
horizontal support must be flush with the room side
of the studs. Use cleats behind both sides of the
support to secure to wall studs.
■ Reinstall drywall.
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Centerline of
installation
space
View from rear
cleats
1” x 6” min.
mounting
support
2
PREPARE THE HOOD
■ Remove the hood from the box. Remove packaging
and tape.
■ Remove one screw on each side of the cover on
the electrical panel. Lift off the cover and set aside
with screws.
■ Stand the electrical panel upright.
■ Align the screw holes in the
bottom of the panel with the
holes on the base of the
hood at the front side.
■ Install 3 screws provided.
Remove 2 side
cover screws
Electrical
panel
Secure electrical
panel with 3
screws
Junction box
Inside screw
1” = 2.5 cm; 1’ = 0.3 m