14
49-80267 Rev. 4
Installation Instructions
WALL-MOUNTED INSTALLATION—RECIRCULATING
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT:
Framing must be capable of supporting
100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ Install a horizontal support at least 1” x 6” between
two wall studs at the mounting screw location. The
horizontal support must be flush with the room side
of the studs. Use cleats behind both sides of the
support to secure to wall studs.
IMPORTANT:
Reinstall drywall for an even mounting
surface.
DUCTWORK, WIRING LOCATIONS
■ Determine the exact location of the vent hood.
■ Locate the template packed with the literature.
■ Measure 36" from the floor to the top of the cooking
surface. Add hood installation height determined on
page 7. Mark that location.
■ Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
■ Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
HOUSE WIRING LOCATION:
■ The junction box is located on the top left side of
the hood.
■ Wiring should enter the back wall 20” to 26” above
the bottom of the hood, and within 4” of the right
side of the centerline.
REAR WALL TEMPLATE
CL
49-80271 JR 07-04
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
ALIGN BOTTOM EDGE WITH
PENCIL LINE INDICATING
BOTTOM OF THE HOOD.
5-1/16"
9-5/8"
8-1/8"
2-1/16"
13-3/4"
12-3/4"
Ceiling
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Centerline of
installation
space
View from rear
cleats
1” x 6” min.
mounting
support
1” = 2.5 cm; 1’ = 0.3 m