ECO‑M‑DK series
105
BE-801372.01-Digital_clocks_manual-221114
©MOBATIME
42
80
60
100
Ø5,2
34
0
340
250
44
42
8
34
0
340
115
7.7.4
Mounting
7.7.4.1
Single sided
• Prepare two holes in the wall by hinges pitch on the backside of the clock.
•
Insert the dowels to the prepared holes and screw the appropriate screws into them.
•
Remove the screws on the bottom of the clock. Remove the bottom cover and plexiglass.
•
Thread the cable(s) through the grommet and hang the clock on the prepared screws
in the wall.
•
Cut the cable(s) to the appropriate length and connect the wires to corresponding terminals
or crimp the RJ45 jack to the Ethernet cable respectively.
•
Mount the plexiglass and bottom cover.
7.7.4.2
Double sided
•
Prepare four holes in the ceiling (or the wall) by bracket flange pinch).
•
Insert the dowels to the prepared holes and fix into them the ceiling suspension (or the wall bracket)
using appropriate screws.
•
Remove the screws on the bottom of the Master clock. Remove the bottom cover
and plexiglass.
•
Cut the cable(s) to the appropriate length and connect the wires to corresponding terminals
or crimp the RJ45 jack to the Ethernet cable respectively.
•
Connect the cable from Slave clock to the Master clock.
•
Mount the plexiglass and bottom cover.
Содержание DSC. 250.4
Страница 1: ...BE 801372 01 Digital_clocks_manual 221114 MOBATIME Instruction manual Digital clocks ...
Страница 31: ...MENU 31 BE 801372 01 Digital_clocks_manual 221114 MOBATIME ...
Страница 141: ......
Страница 142: ......
Страница 143: ......