
41
5.4.2 Automated loading and unloading of racks through the gateway.
After pressing the button START OF PROCESS, the gateway opens, and the
message appears on the screen:
Figure 27. Menu section
«
PROCESS» – automated loading of racks.
Simultaneously with the message appearing, the manipulator starts moving. The
Stainer checks the readiness for the loading of the nearest parking station. Take the rack
with the right hand and put it in the tray of the gateway (Fig. 28)
CAUTION!
THE HANDLE OF RACK SHOULD BE DIRECTED TO THE CENTER OF
THE WORKING CHAMBER (TO THE MANIPULATOR).
Figure 28. Automated loading and unloading of a rack throw the gateway.