24
Series 275 Convectron Module with DeviceNet
Instruction Manual - 275502
3.
Slowly adjust the Setpoint potentiometer on the front panel of the Mini-Convectron Module
Clockwise until the relay energizes. You can see when the relay trips by monitoring the voltage
across pins 8 and 9 of the 9-pin D connector on the Module, or by noticing when the setpoint
signal goes to the device being controlled by the setpoint relay. See Figure 4-3.
NOTE: The pressure settings and voltages listed in Table 4-3 are for use with Air or N
2
ONLY.
Table 4-3
Pressure (Torr) vs. Setpoint Voltage
Pressure
(Torr)
Setpoint
Volts
Pressure
(Torr)
Setpoint
Volts
0
0.321
10
4.186
0.001
0.33
20
4.562
0.002
0.339
50
4.836
0.005
0.363
100
4.935
0.01
0.402
200
5.009
0.0193
0.462
300
5.101
0.02
0.469
400
5.219
0.05
0.628
500
5.324
0.1
0.825
600
5.416
0.2
1.104
700
5.492
0.5
1.638
760
5.532
1
2.182
800
5.556
2
2.812
900
5.612
5
3.650
1000
5.657
Figure 4-3
Series 275 DeviceNet Mini-Convectron Process Control Relay Connector
Содержание 275420-1-GQ-T-00011
Страница 2: ......
Страница 16: ...2 Introduction Specifications 16 Series 275 Convectron Module with DeviceNet Instruction Manual 275502...
Страница 26: ...4 Operation 26 Series 275 Convectron Module with DeviceNet Instruction Manual 275502 Notes...
Страница 31: ...5 DeviceNet Operation Series 275 Convectron Module with DeviceNet Instruction Manual 275502 31...
Страница 32: ...5 DeviceNet Operation 32 Series 275 Convectron Module with DeviceNet Instruction Manual 275502...
Страница 50: ......
Страница 51: ......