-
29
-
'10 • SCM-SM-094
(4) Defrosting operation
(a)
−
40
40
h
2
h
h2
(Th2)
㧙
(Th1) >= 0.44
×
(Th2) + A
A
4
6
6
Th2
㧙
15 °C <= Th2 <
㧙
2 °C
㧙
2 °C <= Th2
Th2 <
㧙
15 °C
Max. 12 minutes and 50 seconds
Heating operation
※
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
※
Hot keep operation
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
O
ut
do
or
he
at
ex
ch
an
ge
r
te
m
pe
ra
tu
re
(
℃
)
Defrost operation
start
De
fro
st o
pe
rat
ion
sta
rt t
em
pe
rat
ure
−
−
(b)
h
2
2
h
20
3
º
Max. 12 minutes and 50 seconds
Heating operation
※
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
※
Hot keep operation
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
O
ut
do
or
he
at
ex
ch
an
ge
r
te
m
pe
ra
tu
re
(
℃
)
Defrost operation
start
De
fro
st o
pe
rat
ion
sta
rt t
em
pe
rat
ure
Содержание SRR60ZJ-S
Страница 52: ...51 10 SCM SM 094 09 SRK DB 087D Service data record form 45...
Страница 132: ...131 10 SCM SM 094 page139 and 160 25A 2 Models SCM50ZJ S 60ZJ S...
Страница 133: ...132 10 SCM SM 094...
Страница 134: ...133 10 SCM SM 094...
Страница 135: ...134 10 SCM SM 094...
Страница 152: ...151 10 SCM SM 094 127 and 138 3 Ceiling concealed type SRR...
Страница 153: ...152 10 SCM SM 094...
Страница 154: ...153 10 SCM SM 094...
Страница 155: ...154 10 SCM SM 094...
Страница 156: ...155 10 SCM SM 094 4 Ceiling cassette 4way compact type FDTC...
Страница 160: ...159 10 SCM SM 094 PJA012D783...