5 - 10 5 - 10
MELSEC-Q
5 SETUP AND PREPARATION
5.6 Communication Test
The transmission and reception tests are performed after connecting the QJ71DN91
and other DeviceNet devices with DeviceNet cables.
There is no restriction on the node No. setting of the communication target.
Execute the test in the following sequence:
Start
Connect QJ71DN91 and other DeviceNet
devices with DeviceNet cables. (See Section 5.5.)
Set same communication speed as those of other
DeviceNet devices. Set mode to A, B or C.
(See Section 5.3.3.)
Test result?
Failed
Normal completion
By powering on from off or resetting CPU
module, test starts.
During test, MS LED flashes green.
RUN
ERR.
MS
NS
When completed normally, MS LED stays
on green.
RUN
ERR.
MS
NS
When failed, MS LED turns off and ERR.
LED turns on.
RUN
ERR.
MS
NS
End
Check error code in Hardware Test Result
Area (address: 062F
H
), and take corrective
actions.
Turn on network power supply and other
DeviceNet devices.
Содержание QJ71DN91
Страница 1: ...DeviceNet Master Slave Module User s Manual QJ71DN91 GX Configurator DN SW1D5C QDNU E ...
Страница 2: ......
Страница 233: ......