OPERATING PROCEDURE
PHOTOS
10. Removing the high pressure switch (63H)
(1) Remove the service panel. (See photo 1)
(2) Remove the top panel. (See photo 1)
(3) Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit and remove the right side panel.
(4) Pull out the lead wire of high pressure switch.
(5) Recover refrigerant.
(6) Remove the welded part of high pressure switch.
Note 1: Recover refrigerant without spreading it in
the air.
Note 2: The welded part can be removed easily by
removing the right side panel.
Note 3: When installing the high pressure switch, cover
it with a wet cloth to prevent it from heating
(210°F or more), then braze the pipes so that
the inside of pipes are not oxidized.
Photo 9-1: PUZ model
11. Removing the reactor (DCL) and capacitor (CE)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 3)
<Removing the reactor>
(4) Remove the reactor fixing screws (6 places, 4 × 10) and
remove the reactor.
<Removing the capacitor>
(4) Remove 2 capacitor band fixing screws (4 × 10) and
remove the capacitor.
Note 1: The reactor and capacitor is attached to the rear
of the electrical parts box.
Note 2: The 3 pieces of reactors to be replaced must
have the same color of sticker. (Green, Orange,
or Blue)
Photo 10
Photo 9-2: PUY model
117
Capacitor band
fixing screws
Reactor fixing
screws
Reactor fixing
screws
Reactor
(DCL)
Electrical parts box
Capacitor (CE)
High pressure
switch (63H)
High pressure
switch (63H)
OCH636A
Содержание PUY-A12NKA7
Страница 119: ...119 OCH636A ...