-1- Outline of Control Method
The heat source units are designated as OC and OS in the order of capacity from large to small (if two or more units have the
same capacity, in the order of address from small to large).
The setting of heat source unit can be verified by using the self-diagnosis switch (SW1).
The OC determines the operation mode and the control mode, and it also communicates with the indoor units.
The OS exercises autonomous distributed control (over defrost, error detection, and actuator control etc.) according to the
operation/control mode signals that are sent from the OC.
-2- Startup sequence rotation
At the initial startup, heat source units start up in the order of "OC and OS."
Startup sequence rotation is performed while all the indoor units are stopped. (Even after two hours of operation, startup se-
quence rotation is not performed while the compressor is in operation.)
In a system with multiple heat source units (OC and OS), when the integrated operation time of the unit in operation (either
OC or OS) reaches one hour during a cooling operation at low outside temperature, that unit will stop and the other unit will
go into operation.
Refer to [-13-Control at Initial Start-up] for the initial startup.
Performing startup sequence rotation does not change the basic operation of OC and OS. Only startup sequence is changed.
Startup sequence of the heat source units can be checked with the self-diagnosis switch (SW1) on the OC.
-3- Initial Control
When the power is turned on, the initial processing of the microcomputer is given top priority.
During the initial processing, control processing of the operation signal is suspended. (The control processing is resumed after
the initial processing is completed. Initial processing involves data processing in the microcomputer and initial setting of each
of the LEV opening. This process will take up to 5 minutes.)
During the initial processing, the LED monitor on the heat source unit's control board displays S/W version -> refrigerant type
-> heat pump -> cooling only and capacity -> and communication address in turn every second.
-4- Control at Start-up
The upper limit of frequency during the first 3 minutes of the operation is 50 Hz.
When the power is turned on, normal operation will start after the initial start-up mode (to be described later) has been com-
pleted (with a restriction on the frequency).
Display
SW1
ON
1 2 3
5
4
6 7 8 9 1 0
The unit is designated as the OC: “oc” appears on the display.
The unit is designated as OS: “oS” appears on the display
Display
SW1
OC→OS: “oc” and the “OC” address appear alternately on the display.
OS→OC: “oS” and the “OS” address appear alternately on the display.
ON
1 2 3
5
4
6 7 8 9 1 0
Содержание PQHY-P120THMU-A
Страница 1: ......
Страница 11: ... 2 ...
Страница 25: ... 16 ...
Страница 83: ... 74 ...
Страница 102: ... III Heat source Unit Components 93 HWE09080 GB 2 RELAY BOARD RELAY 4 board 3 RELAY BOARD RELAY 10 board ...
Страница 103: ... 94 III Heat source Unit Components GB HWE09080 ...
Страница 105: ... 96 ...
Страница 113: ... 104 IV Remote Controller GB HWE09080 ...
Страница 115: ... 106 ...
Страница 130: ... 121 HWE09080 GB VI Refrigerant Circuit 1 Refrigerant Circuit Diagram 123 2 Principal Parts and Functions 126 ...
Страница 131: ... 122 ...
Страница 143: ... 134 VI Refrigerant Circuit GB HWE09080 ...
Страница 145: ... 136 ...
Страница 181: ... 172 VII Control GB HWE09080 ...
Страница 183: ... 174 ...
Страница 235: ... 226 ...
Страница 366: ... 357 HWE09080 GB X LED Monitor Display on the Heat source Unit Board 1 How to Read the LED on the Service Monitor 359 ...
Страница 367: ... 358 ...
Страница 414: ......