![Mitsubishi Electric Got 1000 Скачать руководство пользователя страница 278](http://html.mh-extra.com/html/mitsubishi-electric/got-1000/got-1000_user-manual_240964278.webp)
18 - 6
18. TROUBLESHOOTING
18.1 GOT Restoration Sheet
(3) Wiring of GOT's FG cable and power line
(4) Surge measures
Entry area
Current status
The FG cable and power line of the GOT
are installed together.
Installed together
Not installed
together
Measure for the
cables installed
together
Separating the FG cable and power line of
the GOT in wiring reduces the influence of
noise.
Effective
Ineffective
Current status
A surge suppressor is used for the wiring of
the load such as MCCB, electromagnetic
contactor, relay, solenoid valve, or
induction motor.
(When a surge suppressor is used, fill out
the entry area below with the surge
suppressor model name and the name of
the equipment for which the surge
suppressor is used.)
Used
Not used
Measure for the
equipment without
a surge suppressor
used
Attaching the surge suppressor on the
cable close to the load can reduce the
influence of surge on the GOT.
Effective
Ineffective
Model name of the surge suppressor
Equipment name
GOT
FG
Power for the power equipment
FG
Power for the power equipment
GOT
AC
C
L
R
Output
PLC
AC
C
L
R
Output
PLC
The surge suppressor must be
attached close to the load
Содержание Got 1000
Страница 1: ......
Страница 2: ......
Страница 14: ...A 12 ...
Страница 26: ...1 4 1 OVERVIEW 1 1 Features ...
Страница 34: ...2 8 2 SYSTEM CONFIGURATION 2 2 System Equipment ...
Страница 38: ...3 4 3 SPECIFICATIONS 3 3 Power Supply Specifications ...
Страница 42: ...4 4 4 PARTS NAME 4 3 Rear Face ...
Страница 54: ...6 6 6 INSTALLATION 6 5 Installation Procedure ...
Страница 104: ...10 18 10 COMMUNICATION INTERFACE SETTING COMMUNICATION SETTING 10 3 Ethernet Setting ...
Страница 134: ...12 4 12 CLOCK SETTINGS AND BATTERY STATUS DISPLAY TIME SETTING AND DISPLAY 12 1 Time Setting and Display ...
Страница 226: ...13 92 13 FILE DISPLAY AND COPY PROGRAM DATA CONTROL 13 2 Various Data Control ...
Страница 250: ...15 2 15 CLEANING DISPLAY SECTION CLEAN ...
Страница 264: ...16 14 16 INSTALLATION OF COREOS BOOTOS AND STANDARD MONITOR OS 16 5 CoreOS ...
Страница 272: ...17 8 17 MAINTENANCE AND INSPECTION 17 5 Backlight Shutoff Detection ...
Страница 298: ...App 6 APPENDICES Appendix 1 External Dimensions ...
Страница 302: ...App 10 APPENDICES Appendix 3 Transportation Precautions ...
Страница 306: ...REVISIONS 2 ...
Страница 309: ......
Страница 310: ......