![Mitsubishi Electric Got 1000 Скачать руководство пользователя страница 190](http://html.mh-extra.com/html/mitsubishi-electric/got-1000/got-1000_user-manual_240964190.webp)
13 - 56
13. FILE DISPLAY AND COPY (PROGRAM/DATA CONTROL)
13.2 Various Data Control
(2) Operation of G1L
CSV conversion G1L
TXT conversion
Logging file (G1L file) is converted to CSV file or Unicode text file that can be displayed/edited on PC.
1.
Touch and select the G1L file to convert into a
CSV file or a Unicode text file.
2.
Touch the following button in accordance with
destination file type.
• CSV file: G1L
CSV button
• Unicode text file: G1L
TXT button
3.
Select the target folder.
(Selecting a folder is not needed for outputting
directly below the drive.)
4.
Touching [Execute] button displays the dialog box
shown left.
Touch [OK] button.
(While executing, "Processing..."message
appears on the screen.)
(Example: Dialog box if the [G1L
CSV] button is touched.)
5.
When the file, whose name is the same, exists in
the destination folder, the dialog box shown at left
appears without starting the conversion.
Touching [OK] button overwrites the file.
Touching [Cancel] button cancels the conversion.
6.
The message of completion is displayed in dialog
box when conversion is completed.
Touching [OK] button closes the dialog.
Содержание Got 1000
Страница 1: ......
Страница 2: ......
Страница 14: ...A 12 ...
Страница 26: ...1 4 1 OVERVIEW 1 1 Features ...
Страница 34: ...2 8 2 SYSTEM CONFIGURATION 2 2 System Equipment ...
Страница 38: ...3 4 3 SPECIFICATIONS 3 3 Power Supply Specifications ...
Страница 42: ...4 4 4 PARTS NAME 4 3 Rear Face ...
Страница 54: ...6 6 6 INSTALLATION 6 5 Installation Procedure ...
Страница 104: ...10 18 10 COMMUNICATION INTERFACE SETTING COMMUNICATION SETTING 10 3 Ethernet Setting ...
Страница 134: ...12 4 12 CLOCK SETTINGS AND BATTERY STATUS DISPLAY TIME SETTING AND DISPLAY 12 1 Time Setting and Display ...
Страница 226: ...13 92 13 FILE DISPLAY AND COPY PROGRAM DATA CONTROL 13 2 Various Data Control ...
Страница 250: ...15 2 15 CLEANING DISPLAY SECTION CLEAN ...
Страница 264: ...16 14 16 INSTALLATION OF COREOS BOOTOS AND STANDARD MONITOR OS 16 5 CoreOS ...
Страница 272: ...17 8 17 MAINTENANCE AND INSPECTION 17 5 Backlight Shutoff Detection ...
Страница 298: ...App 6 APPENDICES Appendix 1 External Dimensions ...
Страница 302: ...App 10 APPENDICES Appendix 3 Transportation Precautions ...
Страница 306: ...REVISIONS 2 ...
Страница 309: ......
Страница 310: ......