MEES21K108
PU
H
Y-H
P-T
(S
)N
U
-A
, Y
(S
)N
U
-A
19
2. EXTERNAL DIMENSIONS
Hyper Heating Inverter Y-Series
PUHY-HP144, 192, 240YSNU-A
Unit: mm (in.)
Outdoor unit 2
Front view
Outdoor unit 1
Intake
air
Discharge air
c
b
T
o indoor unit
a
Liquid
T
winning pipe <option parts>
e
T
o indoor unit
Gas
T
winning pipe <option parts>
d
f
Left view
Intake
air
Intake
air
Intake
air
Note 1. Connect the pipes as shown in the figure above. Refer to the table above for the pipe size.
2.
T
winning pipes should not be tilted more than 15 degrees from the horizontal plane.
Be sure to see the Installation Manual for details of
T
winning pipe installation.
3.
The pipe section before the
T
winning pipe (section ″a″ and ″b″ in the figure) must have at least 500mm(19-1
1/16) of
straight section
(*including the straight pipe that is supplied with the
T
winning pipe).
4. Only use the
T
winning pipe by Mitsubishi (optional parts).
T
winning pipe connection size
ø28.58(1-1/8)
CMY
-Y100CBK3
PUHY
-HP144YSNU-A
PUHY
-HP72YNU-A
PUHY
-HP72YNU-A
PUHY
-HP192YSNU-A
PUHY
-HP96YNU-A
PUHY
-HP240YSNU-A
Gas
d or f
Liquid
c or e
Unit model
T
winning pipe~Outdoor unit
HP96
HP120
ø28.58(1-1/8)
a
b
Liquid
Gas
Component unit name
Outdoor unit 1
Package unit name
Outdoor
T
winning Kit(optional parts)
BC controller
~T
winning pipe
Outdoor unit 2
PUHY
-HP96YNU-A
PUHY
-HP120YNU-A
PUHY
-HP120YNU-A
ø15.88(5/8)
ø12.7(1/2)
HP72
ø9.52(3/8)
ø22.2(7/8)
ø12.7(1/2)
740(29-3/16)
1240(48-7/8)
1818(71-5/8)
1240(48-7/8)
30(1-3/16)
5(1/4)
5(1/4)
1250(49-1/4)
1250(49-1/4)
745(29-3/8)
5(1/4)
0000006537.BOOK 19 ページ 2022年4月14日 木曜日 午前10時41分