33
GB
11.1. Caution
1
)ROORZRUGLQDQFHRI\RXUJRYHUQPHQWDORUJDQL]DWLRQIRUWHFKQLFDOVWDQGDUG
UHODWHGWRHOHFWULFDOHTXLSPHQWZLULQJUHJXODWLRQVDQGJXLGDQFHRIHDFK
electric power company.
2
&RQWUROZLULQJKHUHLQDIWHUUHIHUUHGWRDVWUDQVPLVVLRQOLQHVKDOOEHFP>
LQ@RUPRUHDSDUWIURPSRZHUVRXUFHZLULQJVRWKDWLWLVQRWDIIHFWHGE\HOHFWULF
QRLVHIURPSRZHUVRXUFHZLULQJ'RQRWLQVHUWWUDQVPLVVLRQOLQHDQGSRZHU
VRXUFHZLUHLQWKHVDPHFRQGXLW
3
Provide designated grounding work to the heat source unit.
4
,QFOXGHVRPHDOORZDQFHWRZLULQJIRUWKHHOHFWULFDOFRQWUROER[RQWKHLQGRRU
DQGKHDWVRXUFHXQLWVEHFDXVHWKHVHER[HVDUHVRPHWLPHVUHPRYHGDWWKH
WLPHRIVHUYLFHZRUN
5
1HYHUFRQQHFWWKHPDLQSRZHUVRXUFHWRWKHWHUPLQDOEORFNRIWKH
WUDQVPLVVLRQOLQH,IFRQQHFWHGHOHFWULFDOSDUWVZLOOEHGDPDJHG
6
8VHFRUHVKLHOGFDEOHIRUWKHWUDQVPLVVLRQOLQH,IWUDQVPLVVLRQOLQHVRI
GLIIHUHQWV\VWHPVDUHZLUHGZLWKWKHVDPHPXOWLSOHFRUHFDEOHWKHUHVXOWDQW
poor transmitting and receiving will cause erroneous operations.
7
2QO\WKHWUDQVPLVVLRQOLQHVSHFL¿HGVKRXOGEHFRQQHFWHGWRWKHWHUPLQDO
EORFNIRUKHDWVRXUFHXQLWWUDQVPLVVLRQ
The system will not operate with improper connection.
8
,QWKHFDVHRIFRQQHFWLQJDV\VWHPFRQWUROOHURUWRFRQGXFWLQJJURXS
RSHUDWLRQLQGLIIHUHQWUHIULJHUDQWV\VWHPVDWUDQVPLVVLRQOLQHLVUHTXLUHG
EHWZHHQWKHKHDWVRXUFHXQLWVLQGLIIHUHQWUHIULJHUDQWV\VWHPV
&RQQHFWWKHWUDQVPLVVLRQEHWZHHQWKHWHUPLQDOEORFNVIRUFHQWUDOL]HGFRQWURO
WZRZLUHOLQHZLWKQRSRODULW\
9
Use the remote controller to set the groups.
11. Wiring
)RUGHWDLOVUHIHUWRWKHLQVWDOODWLRQPDQXDORIHDFKXQLWDQGFRQWUROOHU
11.2. Control box and connecting position
of wiring
1
Heat source unit
5HPRYHWKHIURQWSDQHORIWKHKHDWVRXUFHXQLWE\XQVFUHZLQJWKHVFUHZV
and pushing it up, then pulling it out.
&RQQHFWWKHLQGRRUKHDWVRXUFHWUDQVPLVVLRQOLQHWRWKHWHUPLQDOEORFN
7%
,IPXOWLSOHKHDWVRXUFHXQLWVDUHFRQQHFWHGLQWKHVDPHUHIULJHUDQWV\VWHP
GDLV\FKDLQ7%00
7HUPLQDORQWKHKHDWVRXUFHXQLWV&RQQHFW
WKHLQGRRUKHDWVRXUFHWUDQVPLVVLRQOLQHWR7%00
7HUPLQDORI
RQO\RQHRIWKHKHDWVRXUFHXQLWV
&RQQHFWWKHWUDQVPLVVLRQOLQHVIRUFHQWUDOL]HGFRQWUROEHWZHHQWKH
FHQWUDOL]HGFRQWUROV\VWHPDQGWKHKHDWVRXUFHXQLWRIGLIIHUHQWUHIULJHUDQW
V\VWHPVWRWKHWHUPLQDOEORFNIRUFHQWUDOL]HGFRQWURO7%,IWKHPXOWLSOH
KHDWVRXUFHXQLWVDUHFRQQHFWHGWRWKHVDPHUHIULJHUDQWV\VWHPGDLV\FKDLQ
7%0067HUPLQDORQWKHKHDWVRXUFHXQLWV
,I7%RQWKHKHDWVRXUFHXQLWLQWKHVDPHUHIULJHUDQWV\VWHPLVQRW
GDLV\FKDLQHGFRQQHFWWKHWUDQVPLVVLRQOLQHIRUFHQWUDOL]HGFRQWUROWR
7%RQWKH2&,IWKH2&LVRXWRIRUGHURULIWKHFHQWUDOL]HGFRQWURO
LVEHLQJFRQGXFWHGGXULQJWKHSRZHUVXSSO\VKXWRIIGDLV\FKDLQ7%
on the OC and OS (In the case that the heat source unit whose power
VXSSO\FRQQHFWRU&1RQWKHFRQWUROERDUGKDVEHHQUHSODFHGZLWK
&1LVRXWRIRUGHURUWKHSRZHULVVKXWRIIFHQWUDOL]HGFRQWUROZLOOQRW
EHFRQGXFWHGHYHQZKHQ7%LVGDLV\FKDLQHG
2&DQG26RIWKHKHDWVRXUFHXQLWVLQWKHVDPHUHIULJHUDQWV\VWHPDUH
DXWRPDWLFDOO\LGHQWL¿HG7KH\DUHLGHQWL¿HGDV2&DQG26LQGHVFHQGLQJ
RUGHURIFDSDFLW\,IWKHFDSDFLW\LVWKHVDPHWKH\ZLOOEHLQDVFHQGLQJ
RUGHURIWKHLUDGGUHVVQXPEHU
7KHLQGRRUKHDWVRXUFHWUDQVPLVVLRQOLQHFRQQHFWWKHVKLHOGJURXQGWRWKH
ground terminal (
)RUWKHFHQWUDOL]HGWUDQVPLVVLRQOLQHVFRQQHFWWR
WKHVKLHOGWHUPLQDO6RQWKHWHUPLQDOEORFN7%,IWKHKHDWVRXUFHXQLWV
ZKRVHSRZHUVXSSO\FRQQHFWRU&1LVUHSODFHGZLWK&1VKRUWFLUFXLWWKH
VKLHOGWHUPLQDO6DQGWKHJURXQGWHUPLQDO
LQDGGLWLRQWRWKHDERYH
$WWDFKWKHFRQQHFWHGZLUHVVHFXUHO\ZLWKWKHFDEOHVWUDSDWWKHERWWRPRIWKH
WHUPLQDOEORFN([WHUQDOIRUFHDSSOLHGWRWKHWHUPLQDOEORFNPD\GDPDJHLW
UHVXOWLQJLQDVKRUWFLUFXLWJURXQGIDXOWRUD¿UH
Caution:
7LJKWHQWHUPLQDOVFUHZVWRWKHVSHFL¿HGWRUTXH
3RRUZLUHFRQWDFWFDXVHGE\ORRVHVFUHZVPD\UHVXOWLQRYHUKHDWLQJDQG
UHVXOWDQW¿UH
7KHXVHRIWKHXQLWZLWKDGDPDJHGFLUFXLWERDUGPD\UHVXOWLQRYHUKHDWLQJDQG
UHVXOWDQW¿UH
Note:
7LJKWHQWHUPLQDOVFUHZVWRWKHVSHFL¿HGWRUTXH
7HUPLQDOEORFN7%0VFUHZa>1āP@
7HUPLQDOEORFN7%7%0VFUHZa>1āP@
Make sure that the spring washers are parallel to the terminal block.
Make sure that the wires are securely fastened to the terminal screws.
Drive the screws straight down, and use caution not to damage the
screw heads.
Install the ring terminals back to back so that the screws can be driven
straight down.
Make an alignment mark with a permanent marker across the screw
head, washer, and terminal after tightening the screws.
[Fig. 11.2.1] (P.15)
A
Power source
B
Transmission line
C
Ground terminal
[Fig. 11.2.2] (P.15)
A
Terminal block with loose screws
B
Properly installed terminal block
C
Spring washers must be parallel to the terminal block.
[Fig. 11.2.3] (P.15)
A
Power wires, transmission lines
B
'DLV\FKDLQWUDQVPLVVLRQOLQHVRQO\
C
7HUPLQDOEORFNV7%7%7%
D
Make an alignment mark.
E
Install the ring terminals back to back.
[Fig. 11.2.4] (P.15)
A
Cable strap
B
Power source cable
C
*URXQGWHUPLQDOIRU¿HOGZLULQJFRQQHFWLRQ
2
Conduit tube installation
+DPPHUWKHNQRFNRXWKROHVIRUWKHFRQGXLWWXEHORFDWHGRQWKHEDVHDQGWKH
ERWWRPSDUWRIWKHIURQWSDQHO
When installing the conduit tube directly through the knockout holes, remove
burrs and protect the tube with masking tape.
8VHWKHFRQGXLWWXEHWRQDUURZWKHRSHQLQJLIWKHUHLVDSRVVLELOLW\RIVPDOO
animals entering the unit.
11.3. Wiring transmission cables
1
Types of control cables
1. Wiring transmission cables
7\SHVRIWUDQVPLVVLRQFDEOHV6KLHOGLQJZLUH&996&3(96RU0996
Cable diameter: More than 1.25 mm
2
>$:*@
0D[LPXPZLULQJOHQJWK:LWKLQP>IW@
0D[LPXPOHQJWKRIWUDQVPLVVLRQOLQHVIRUFHQWUDOL]HGFRQWURODQGLQGRRUKHDW
VRXUFHWUDQVPLVVLRQOLQHVP>IW@DWWKHPD[LPXP
7KHPD[LPXPOHQJWKRIZLULQJEHWZHHQSRZHUVXSSO\XQLWIRUWUDQVPLVVLRQ
OLQHVIRUFHQWUDOL]HGFRQWURODQGHDFKKHDWVRXUFHXQLWDQGV\VWHPFRQWUROOHU
LVP>IW@
2. Remote control cables
ME Remote Controller
7\SHRIUHPRWHFRQWUROFDEOH
6KHDWKHGFRUHFDEOH
&99VKLHOGHG&996&3(96RU0996
Cable diameter
0.3 to 1.25 mm
2
>$:*WR@
(0.75 to 1.25 mm
2
>$:*WR@
Remarks
:KHQP>IW@LVH[FHHGHGXVHFDEOH
ZLWKWKHVDPHVSHFL¿FDWLRQVDV:LULQJ
transmission cables.
&RQQHFWHGZLWKVLPSOHUHPRWHFRQWUROOHU
&996099639&LQVXODWHG39&MDFNHWHGVKLHOGHGFRQWUROFDEOH
&3(963(LQVXODWHG39&MDFNHWHGVKLHOGHGFRPPXQLFDWLRQFDEOH
CVV: PVC insulated PVC sheathed control cable
MA Remote Controller
7\SHRIUHPRWHFRQWUROFDEOH
6KHDWKHGFRUHFDEOHXQVKLHOGHG&99
Cable diameter
0.3 to 1.25 mm
2
>$:*WR@
(0.75 to 1.25 mm
2
>$:*WR@
Remarks
:LWKLQP>IW@
&RQQHFWHGZLWKVLPSOHUHPRWHFRQWUROOHU