background image

1

WARRANTY AND SERVICE

On condition that principles, warnings and standards specified in the usage manual are obeyed, 

your device is under Ekin Endüstriyel warranty against material and manufacturing defects for 2 

(two) years.

Before commencing the assembly process, please read this manual carefully. Expert technical 

team is required for the assembly, please demand the required expert technical team from your 

authorized dealer. It is necessary to follow conditions written in this manual to conduct selecting 

assembly location, installation, chimney and electrical connections.
Warranty period begins with the commissioning of device, our Authorized Service commissioning 

the device will fill the Commissioning Form and sign the form. Do not forget to receive a copy of 

Commissioning Form by reading and signing and keep the form.
For such devices, expected usage life specified by the Ministry of Industry and Trade is 10 (ten) 

years. As required by applicable law, manufacturers and vendors during this period undertake 

to keep for spare parts required to fulfill the functions of devices and to provide maintenance 

services to the device.

Terms Of Warranty

•  The warranty period starts from the date of delivery of the device, and is 2 years.
•  All parts of this heating device is covered by the warranty of ourcompany for 2 years.

Consumables on the device (gasket, suppositories, ceramic pipe etc.) are outside the scope 

of warranty.

•  In the event that the device malfunctions within the guarantee period, theguarantee period 

shall be extended at the rate of the period for such repairs. Device repair duration shall not 

exceed 20 business days. This duration shall start from the date of notification to the service 

station, and in the event of the absence of the service station, from the date of notification to 

one of device vendor, dealer, agent, representative, importer or manufacturer. Customer can 

inform the fault notification via phone, fax, e-mail, registered mail or any similar way. However, in 

the event of dispute, burden of proof belongs to the consumer. In the event that device’s fault is 

not recovered within 20 days, manufacturer-producer or importer are obliged to assign another 

product with similar features to the consumer until the repair of device is completed.

•  In the event of any malfunctions because of either material or workmanship, or assembly errors 

to occur within the duration of warranty, repairs will be carried out without requesting any fees 

under the title of workmanship cost, changed part price or any other items.

•  Despite using consumer’s usage of right to repair, if the device;

- Malfunctions at least four times within a year falling within the warranty period as of the delivery 

to the customer or malfunctions at least six times during the warranty period specified by 

manufacturer-producer and/or importer, also if these failures make it impossible to make use 

of these devices,

- Exceeding the maximum amount of time required to repair,

- Consumer may request device replacement for free, the price discount or discount at amount 

of defective good price in the event that service station of the company is not available and 

it is not possible to repair the damage according to the report issued by one of seller, dealer, 

agent, importer-manufacturer, representative.

Содержание TLG 100

Страница 1: ...Heating Boiler User Guide...

Страница 2: ...www facebook com ekinendustriyel www youtube com ekinendustriyel www linkedin com company ekinendustriyel www soundcloud com ekinendustriyel www twitter com ekinendustriyel www spotify com ekin endus...

Страница 3: ...stioning of the status quo and our desire to outperform ourselves New Generation Engineering With our engineering approach that focuses on the process not the problem we do not just specialize in a pr...

Страница 4: ...te Valves Actuators Check Valves and Strainers Thermoplastic Valves Boilers Steam Generators Solar Collectors Chillers Cooling Towers Gasketed Plate Heat Exchangers Brazed Heat Exchangers Shell Tube H...

Страница 5: ...1 Precautions 3 Product General Specifications 7 Shipping And Installation 13 First Run And Considerations Before First Run 20 Boiler Water Specifications 21 General Maintenance 21 Detection And Fixi...

Страница 6: ...te of the period for such repairs Device repair duration shall not exceed 20 business days This duration shall start from the date of notification to the service station and in the event of the absenc...

Страница 7: ...outside the scope of warranty In case of wrong connection while installing electricity connection of the device any related failures shall be outside the scope of warranty Failure to comply with techn...

Страница 8: ...r problems originated from boilers installed in living quarters In installations with closed expansion tank make sure to use automatic safety valve suitable for boiler operating pressure Our company c...

Страница 9: ...e explosion of the boiler In this case please check the circulation pump working immediately close burner and wait for cooling in natural way then contact to authorized service To prevent any accident...

Страница 10: ...er does not work again related burner authorized service must be called If you feel or smell gas or if there is a gas leak Stay calm Extinguish any burning fires Open doors and windows Close valves of...

Страница 11: ...nical support we remind you to prepare the following information for providing better service to you Located on the aluminum sheet label on the device 1 Year of manufacture and serial number of the de...

Страница 12: ...1 2 1 2 1 2 1 2 Back Pressure mbar 1 2 1 3 1 5 2 2 2 3 2 5 Standard Operating Pressure bar 4 4 4 4 4 4 Ekin End striyel MG series gas fueled heating boilers are manufactured with three pass Known as...

Страница 13: ...1 2 1 2 1 1 1 Back Pressure mbar 2 8 3 3 8 5 2 5 2 5 7 Standard Operating Pressure bar 4 4 4 4 4 4 TLG TECHNICAL SPECIFICATIONS Model TLG 600 TLG 700 TLG 800 TLG 900 TLG 1000 TLG 1250 Capacity kcal h...

Страница 14: ...2 5 Back Pressure bar 4 4 4 4 4 TLG TECHNICAL SPECIFICATIONS Model TLG 1500 TLG 1750 TLG 2000 TLG 2500 TLG 3000 TLG 3500 Capacity kcal h 1 500 000 1 750 000 2 000 000 2 500 000 3 000 000 3 500 000 kW...

Страница 15: ...se mbar 3 3 3 2 8 2 5 3 Back Pressure bar 4 4 4 4 4 TWG TECHNICAL SPECIFICATIONS Model TWG 450 TWG 500 TWG 600 TWG 700 TWG 800 TWG 1000 Capacity kcal h 450 000 500 000 600 000 700 000 800 000 1 000 00...

Страница 16: ...2289 Height L mm 2720 2920 3515 3915 3915 4219 Length L1 mm 2194 2394 2994 3394 3394 3698 Foot record E mm 500 500 500 500 500 500 Chimney Diameter H2 mm 1460 1460 1585 1585 1643 1670 Chimney Height...

Страница 17: ...635 2687 Height L mm 5245 5251 5345 5747 6721 Length L1 mm 4724 4730 4826 5226 6200 Foot record E mm 500 500 500 600 600 Chimney Diameter H2 mm 1776 1884 1884 1966 2014 Chimney Height F DN 200 200 200...

Страница 18: ...panies From the point of safety of you and your environment never install the device in daily life sections kitchen bathroom hallway etc open spaces and balconies places where explosive and easily fla...

Страница 19: ...elbow is required it is crucial to use round and wide angle elbows and not to use more than two elbows Steel chimney connection must be manufactured and assembled in a way to disassemble from boiler...

Страница 20: ...PIPING FEEDING WATER OUTLET DISCHARGE VALVE CUT OFF VALVE TEMPERATURE PROBE DISCHARGING PIPE DIRT SEPERATOR AIR RELIEF COCK SAFETY VALVE CIRCULATION PUMP CHECKVALVE THREE WAY VALVE MANOMETER THERMOME...

Страница 21: ...ry Fed Operation Time Mod 1 20 35 mA Mod 2 8 10 mA Available Battery Type 5 hours Rechargeable Battery Rechargeable Battery NiMh 9V Battery Charging Method Constant Current and Constant Voltage Batter...

Страница 22: ...g down when there is temperature difference between boiler water temperature and adjusted thermostat temperature as much as burner first stage difference temperature the burner is activated at first l...

Страница 23: ...ry After adjusting system with stages above adjust thermostat temperature with up arrow button When you turn off the device with device On Off button the system will start to work in this configuratio...

Страница 24: ...ch burner second stage adjustment menu press Selectbutton five times and you will see the following screen 2 Hold the up arrow button the indicator will display off on screenwhen you select 98 3 Wait...

Страница 25: ...pass valve Air must be taken from air intake valves and air relief cocks in the installation Circulation pump should not be run during air intake Ekin End striyel is not responsible for the burner on...

Страница 26: ...ck the following considerations Monitor operations of boiler fittings thermostat thermometer hydrometer manometer all the time do the necessary controls replace it if necessary By putting thin mineral...

Страница 27: ...external temperature is 12 C and lower When external air temperature is between 12 15 C heating system should be operated in limited mode If external air temperature is 15 C and higher heater should...

Страница 28: ...e missing water It is required to use with appropriate safety valve Closed expansion tanks can only be used in liquid and gas fueled heating systems provided automatic control mechanical combustion Fu...

Страница 29: ...mbly Scheme 1 Gas filter 2 Test nipple 3 Push tap and manometer 4 Compensator 5 Global gas valve 6 Gas entry line 7 Mutliblock gas valve Filter Regulator Minimum gas processor Safety gas valve operati...

Страница 30: ...laced with an appropriate pump Make your burner checked by authorized service Water accumulation or leakage in smoke chest Condensation of water vapor in flue gas Failure in operating boiler in low te...

Страница 31: ...there is AC energy input to the system Temperature warning is flashing on the screen Overheating in boiler Boiler temperature increases over 95 degrees Lower the temperature The burner cannot be activ...

Страница 32: ...27 CERTIFICATES...

Страница 33: ......

Страница 34: ...ICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERV...

Страница 35: ......

Страница 36: ...4EK N Dudullu Organize Sanayi B lgesi Des Sanayi Sitesi 107 Sk B14 Blok No 2 mraniye stanbul Turkey Phone 90 216 232 2412 Fax 90 216 660 13 08 info ekinendustriyel com www ekinendustriyel com Is tma S...

Отзывы: