background image

3

•  In the event that boiler water and/or return water temperature is less than 50 °C, defects that 

may occur due to condensation shall be outside the scope of warranty. To avoid this situation, 

it is recommended to use 3-way valve and companization system etc.

•  Defects and problems occurring as a result of natural disasters, external/physical outer factors 

not originating from the product, seasonal weather conditions and environmental factors 

(earthquake, fire, flood, inundation, high winds, lightning, lime, high limy installation, muddy, 

dirty, humidity, dust etc.) are outside the scope of warranty.

PRECAUTIONS

This Device is manufactured to feed heating installation as the heater and to prepare utility hot 
water. The device cannot be used to obtain clean water directly.

The manufacturer cannot be held responsible for damages that occur due to reasons such as 
improper uses, interventions made by unauthorized persons or user, faulty installation, wrong 
operations.

Due to safety reasons, do not install boilers in a closed environment where people live. Toxic 
waste gases may leak into the environment due to boiler pipes and chimney filling with dust and 
fly ash or high winds. For this reason, boilers should be installed in places outside residents and 
places with continuously ventilation. Our company is not responsible for problems originated 
from boilers installed in living quarters. In installations with closed expansion tank, make sure 
to use automatic safety valve suitable for boiler operating pressure. Our company cannot be 
held responsible for any problems originated from failure in using safety valve in boilers that 
are operated with closed expansion tank. Connect closed expansion tanks in accordance with 
standards. Small capacities cause overheating by leaving the boiler waterless.

Heating installation must be carried out by authorized personnel. It is recommended not to use 
plastic pipe in the installation.

Do not use boilers outside their purposes. Our company is not responsible for any problems that 
may occur due to incorrect use.

Our boilers are not low-temperature boilers, and they are designed for 90/70 °C operating 
temperature. Condensation will occur in the event of operating the boiler in low temperature. 
Problems faced in the event of continuous condensation shall be outside the scope of warranty.

Heating boiler may cause accidents that could cause loss of life in an explosion or similar way or 
through fire if they are operated outside operating conditions specified in this manual. Therefore, 
the first time commissioning, tuning, maintenance and cleaning operations of the Ekin Endüstriyel 
heating boiler must be performed only by Ekin Endüstriyel Authorized Services.

When failure occurs in the heating system, the boiler must be stopped. Defective parts must be 
replaced by authorized service centers only.

Содержание TLG 100

Страница 1: ...Heating Boiler User Guide...

Страница 2: ...www facebook com ekinendustriyel www youtube com ekinendustriyel www linkedin com company ekinendustriyel www soundcloud com ekinendustriyel www twitter com ekinendustriyel www spotify com ekin endus...

Страница 3: ...stioning of the status quo and our desire to outperform ourselves New Generation Engineering With our engineering approach that focuses on the process not the problem we do not just specialize in a pr...

Страница 4: ...te Valves Actuators Check Valves and Strainers Thermoplastic Valves Boilers Steam Generators Solar Collectors Chillers Cooling Towers Gasketed Plate Heat Exchangers Brazed Heat Exchangers Shell Tube H...

Страница 5: ...1 Precautions 3 Product General Specifications 7 Shipping And Installation 13 First Run And Considerations Before First Run 20 Boiler Water Specifications 21 General Maintenance 21 Detection And Fixi...

Страница 6: ...te of the period for such repairs Device repair duration shall not exceed 20 business days This duration shall start from the date of notification to the service station and in the event of the absenc...

Страница 7: ...outside the scope of warranty In case of wrong connection while installing electricity connection of the device any related failures shall be outside the scope of warranty Failure to comply with techn...

Страница 8: ...r problems originated from boilers installed in living quarters In installations with closed expansion tank make sure to use automatic safety valve suitable for boiler operating pressure Our company c...

Страница 9: ...e explosion of the boiler In this case please check the circulation pump working immediately close burner and wait for cooling in natural way then contact to authorized service To prevent any accident...

Страница 10: ...er does not work again related burner authorized service must be called If you feel or smell gas or if there is a gas leak Stay calm Extinguish any burning fires Open doors and windows Close valves of...

Страница 11: ...nical support we remind you to prepare the following information for providing better service to you Located on the aluminum sheet label on the device 1 Year of manufacture and serial number of the de...

Страница 12: ...1 2 1 2 1 2 1 2 Back Pressure mbar 1 2 1 3 1 5 2 2 2 3 2 5 Standard Operating Pressure bar 4 4 4 4 4 4 Ekin End striyel MG series gas fueled heating boilers are manufactured with three pass Known as...

Страница 13: ...1 2 1 2 1 1 1 Back Pressure mbar 2 8 3 3 8 5 2 5 2 5 7 Standard Operating Pressure bar 4 4 4 4 4 4 TLG TECHNICAL SPECIFICATIONS Model TLG 600 TLG 700 TLG 800 TLG 900 TLG 1000 TLG 1250 Capacity kcal h...

Страница 14: ...2 5 Back Pressure bar 4 4 4 4 4 TLG TECHNICAL SPECIFICATIONS Model TLG 1500 TLG 1750 TLG 2000 TLG 2500 TLG 3000 TLG 3500 Capacity kcal h 1 500 000 1 750 000 2 000 000 2 500 000 3 000 000 3 500 000 kW...

Страница 15: ...se mbar 3 3 3 2 8 2 5 3 Back Pressure bar 4 4 4 4 4 TWG TECHNICAL SPECIFICATIONS Model TWG 450 TWG 500 TWG 600 TWG 700 TWG 800 TWG 1000 Capacity kcal h 450 000 500 000 600 000 700 000 800 000 1 000 00...

Страница 16: ...2289 Height L mm 2720 2920 3515 3915 3915 4219 Length L1 mm 2194 2394 2994 3394 3394 3698 Foot record E mm 500 500 500 500 500 500 Chimney Diameter H2 mm 1460 1460 1585 1585 1643 1670 Chimney Height...

Страница 17: ...635 2687 Height L mm 5245 5251 5345 5747 6721 Length L1 mm 4724 4730 4826 5226 6200 Foot record E mm 500 500 500 600 600 Chimney Diameter H2 mm 1776 1884 1884 1966 2014 Chimney Height F DN 200 200 200...

Страница 18: ...panies From the point of safety of you and your environment never install the device in daily life sections kitchen bathroom hallway etc open spaces and balconies places where explosive and easily fla...

Страница 19: ...elbow is required it is crucial to use round and wide angle elbows and not to use more than two elbows Steel chimney connection must be manufactured and assembled in a way to disassemble from boiler...

Страница 20: ...PIPING FEEDING WATER OUTLET DISCHARGE VALVE CUT OFF VALVE TEMPERATURE PROBE DISCHARGING PIPE DIRT SEPERATOR AIR RELIEF COCK SAFETY VALVE CIRCULATION PUMP CHECKVALVE THREE WAY VALVE MANOMETER THERMOME...

Страница 21: ...ry Fed Operation Time Mod 1 20 35 mA Mod 2 8 10 mA Available Battery Type 5 hours Rechargeable Battery Rechargeable Battery NiMh 9V Battery Charging Method Constant Current and Constant Voltage Batter...

Страница 22: ...g down when there is temperature difference between boiler water temperature and adjusted thermostat temperature as much as burner first stage difference temperature the burner is activated at first l...

Страница 23: ...ry After adjusting system with stages above adjust thermostat temperature with up arrow button When you turn off the device with device On Off button the system will start to work in this configuratio...

Страница 24: ...ch burner second stage adjustment menu press Selectbutton five times and you will see the following screen 2 Hold the up arrow button the indicator will display off on screenwhen you select 98 3 Wait...

Страница 25: ...pass valve Air must be taken from air intake valves and air relief cocks in the installation Circulation pump should not be run during air intake Ekin End striyel is not responsible for the burner on...

Страница 26: ...ck the following considerations Monitor operations of boiler fittings thermostat thermometer hydrometer manometer all the time do the necessary controls replace it if necessary By putting thin mineral...

Страница 27: ...external temperature is 12 C and lower When external air temperature is between 12 15 C heating system should be operated in limited mode If external air temperature is 15 C and higher heater should...

Страница 28: ...e missing water It is required to use with appropriate safety valve Closed expansion tanks can only be used in liquid and gas fueled heating systems provided automatic control mechanical combustion Fu...

Страница 29: ...mbly Scheme 1 Gas filter 2 Test nipple 3 Push tap and manometer 4 Compensator 5 Global gas valve 6 Gas entry line 7 Mutliblock gas valve Filter Regulator Minimum gas processor Safety gas valve operati...

Страница 30: ...laced with an appropriate pump Make your burner checked by authorized service Water accumulation or leakage in smoke chest Condensation of water vapor in flue gas Failure in operating boiler in low te...

Страница 31: ...there is AC energy input to the system Temperature warning is flashing on the screen Overheating in boiler Boiler temperature increases over 95 degrees Lower the temperature The burner cannot be activ...

Страница 32: ...27 CERTIFICATES...

Страница 33: ......

Страница 34: ...ICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERVICE SERV...

Страница 35: ......

Страница 36: ...4EK N Dudullu Organize Sanayi B lgesi Des Sanayi Sitesi 107 Sk B14 Blok No 2 mraniye stanbul Turkey Phone 90 216 232 2412 Fax 90 216 660 13 08 info ekinendustriyel com www ekinendustriyel com Is tma S...

Отзывы: