background image

  P A G E   1   O F   1 7  

M I S S I ON  S OL A R  E NE R G Y L L C

ELECTRONIC 

versions are uncontrolled except when accessed directly from document control directory. Printed copies are uncontrolled unless verified against online document.

 

C OP YR I GH T   2 0 2 0  M I S S IO N   S OL A R   E N ER GY   L L C ,   AL L   R I G H T S   R ES E R V ED  

  REVISION: R2   

 RELEASE DATE: 9/25/2020 

TABLE OF CONTENTS 

1.0

 

DISCLAIMER ............................................................................................ 2

 

2.0

 

HANDLING AND USE ................................................................................. 2

 

3.0

 

LIMITATION OF LIABILITY AND LIMITED REMEDIES ........................................ 2

 

4.0

 

GENERAL INSTRUCTIONS ........................................................................... 2

 

5.0

 

SAFETY .................................................................................................. 3

 

5.1

 

General Warning ..................................................................................................................................................... 3

 

5.2

 

Mechanical .............................................................................................................................................................. 3

 

5.3

 

Electrical Shock Hazard ........................................................................................................................................... 3

 

5.4

 

Fire .......................................................................................................................................................................... 3

 

6.0

 

OPERATING CONDITIONS .......................................................................... 4

 

6.1

 

Temperature ........................................................................................................................................................... 4

 

6.2

 

INSTALLATION CONDITION ..................................................................................................................................... 4

 

7.0

 

UNPACKING & STORAGE ............................................................................ 5

 

7.1

 

General Instructions ................................................................................................................................................ 5

 

7.2

 

Unpacking Instructions ........................................................................................................................................... 6

 

8.0

 

PRODUCT SPECIFICATION .......................................................................... 8

 

Table 1: Electrical Ratings of MSE PERC 72 (6BB, White backsheet) Module Series ............................................................. 8

 

Table 2: Electrical Ratings of MSE PERC 72 (6BB, BLACK Backsheet) Module Series ............................................................ 8

 

Table 3: Electrical Ratings of MSE PERC 60 (6BB, White Backsheet) Module Series ............................................................. 8

 

Table 4: Electrical Ratings of MSE PERC 60 (6BB, Black Backsheet) Module Series .............................................................. 9

 

Table 5: Electrical Ratings of MSE PERC 66 (6BB, Black Backsheet) Module Series .............................................................. 9

 

Table 6: module Temperature coefficient ............................................................................................................................. 9

 

9.0

 

MECHANICAL INSTALLATION ...................................................................... 9

 

9.1

 

Ground Mount ...................................................................................................................................................... 10

 

9.2

 

Roof Mount ........................................................................................................................................................... 10

 

9.3

 

Pole Mount ........................................................................................................................................................... 10

 

9.4

 

MOUNTING OPTIONS ............................................................................................................................................ 10

 

Table 7: Design Load As Specified By UL61730 ................................................................................................................... 11

 

Figure 1: Bolt Method ......................................................................................................................................................... 11

 

Figure 2: Clamp Method ...................................................................................................................................................... 11

 

10.0

 

GROUNDING INSTRUCTIONS .................................................................... 14

 

10.1

 

WEEB-UIR .............................................................................................................................................................. 14

 

11.0

 

ELECTRICAL  INSTALLATION ...................................................................... 15

 

11.1

 

Local / National Code and Local Regulation .......................................................................................................... 15

 

11.2

 

Wiring .................................................................................................................................................................... 15

 

11.3

 

Connectors ............................................................................................................................................................ 16

 

11.4

 

Diodes ................................................................................................................................................................... 16

 

12.0

 

MAINTENANCE ...................................................................................... 16

 

12.1

 

Visual Inspection ................................................................................................................................................... 16

 

12.2

 

Cleaning................................................................................................................................................................. 16

 

Содержание MSE PERC 60 Series

Страница 1: ...PERC Series ModuleTypes MSExxxSX6S MSExxxSX6W MSExxxSX6Z MSExxxSX5T MSExxxSX5K MSExxxSX5R Module Installation User Manual REV R2 REVISION DATE 1 29 2021...

Страница 2: ...8 0 PRODUCT SPECIFICATION 8 Table 1 Electrical Ratings of MSE PERC 72 6BB White backsheet Module Series 8 Table 2 Electrical Ratings of MSE PERC 72 6BB BLACK Backsheet Module Series 8 Table 3 Electric...

Страница 3: ...eys fees claims arising out of or resulting from the handling use processing alteration distributions sale or marketing of modules and this manual or any other action or inaction with regard to the mo...

Страница 4: ...es with higher light intensity DC voltage of 30 Volts or higher is potentially lethal Contacting the live circuitry of a PV system operating under light can result in lethal electric shock Use insulat...

Страница 5: ...emperatures Minimum ambient air temperatures 40o C 40o F Maximum ambient air temperatures 40o C 104o F 6 2 INSTALLATION CONDITION Orient the module correctly Mount the modules with the junction box in...

Страница 6: ...forks to handle module pallet Do not mark the modules with sharp instruments Unpack the module pallet with care and follow the unpacking steps in this manual Be careful when unpacking transporting an...

Страница 7: ...when cut Eye protection is highly recommended Lift the pallet lid and set it away from unpacking area Using a box cutter carefully cut along the corner from the top to the middle of the box on the pac...

Страница 8: ...individual modules The first module must be separated and pulled out with additional care so as to not scratch the modules Continue removing modules by peeling back tape moving the module forward and...

Страница 9: ...ce 0 3 0 3 0 3 0 3 0 3 Open Circuit Voltage Voc V 48 56 48 71 48 92 49 14 49 28 Short Circuit Current Isc A 10 89 10 93 10 99 11 05 11 09 Rated Voltage Vmp V 39 59 39 73 39 93 40 14 40 27 Rated Curren...

Страница 10: ...ule Peak power C Voltage C Current C NOCT C MSExxxSX6S MSExxxSX6W xxx 405 425 in step of 5W xxx is standing for rated output power at STC 0 359 o C 0 261 o C 0 044 o C 44 69 o C MSExxxSX6Z xxx 405 425...

Страница 11: ...le on a roof or building ensure that it is securely fastened and cannot fall as a result of wind or snow loads Provide adequate ventilation under the module for cooling 10cm minimum air space between...

Страница 12: ...AD BACK OF MODULE DESIGN LOAD Bolt method SX6S SX6W SX6Z 546mm 3600 Pa 1600 Pa SX6R 506mm 3600 Pa 1600 Pa SX5T SX5K 470mm 3600 Pa 1600 Pa Clamp method SX6S SX6W SX6Z 469mm D 546mm 3600 Pa 1600 Pa 469m...

Страница 13: ...of 2000m Artificially concentrated sunlight should not be directed on the module Rated electrical characteristics are within 10 percent of measured values at Standard Test Conditions of 1000 W m2 25 C...

Страница 14: ...when accessed directly from document control directory Printed copies are uncontrolled unless verified against online document COP YR IGHT 2020 M ISSIO N SOL A R EN ER GY LLC ALL R IGHT S R ESERVED R...

Страница 15: ...unding device manufacturer s instructions and be used with a racking system in compliance with UL Outline Standard 2703 where this module has been evaluated with that racking system 10 1 WEEB UIR The...

Страница 16: ...ions with ability to work in a temperature range of at least 40o C and 90o C Install the modules so that water from rain or condensation cannot penetrate inside the cable conduits Fix cables to the st...

Страница 17: ...commends that PV systems be periodically inspected by the installer or other qualified personnel The purpose of the PV system inspection is to ensure that all system components are functioning properl...

Страница 18: ...ions are uncontrolled except when accessed directly from document control directory Printed copies are uncontrolled unless verified against online document COP YR IGHT 2020 M ISSIO N SOL A R EN ER GY...

Отзывы: