background image

  P A G E   2   O F   1 7  

M I S S I ON  S OL A R  E NE R G Y L L C

ELECTRONIC 

versions are uncontrolled except when accessed directly from document control directory. Printed copies are uncontrolled unless verified against online document.

 

C OP YR I GH T   2 0 2 0  M I S S IO N   S OL A R   E N ER GY   L L C ,   AL L   R I G H T S   R ES E R V ED  

  REVISION: R2   

 RELEASE DATE: 9/25/2020 

1.0

 

DISCLAIMER 

This manual is provided on an “as is” basis without warranty, covenant or representative of any kind, express or implied, 

including the warranties of merchantability or fitness for a particular purpose. Mission Solar Energy uses its best efforts 

to ensure the accuracy of the contents of this manual; however, Mission Solar Energy is not responsible for the accuracy 

of said contents or results of your use of the same. Under no circumstances will Mission Solar Energy be liable to you or 

any third party for damages arising under any legal theory including contract, tort, negligence or strict liability or for 

direct, indirect, special, consequential; or punitive damages of any kind, including lost profits. Mission Solar Energy 

reserves the right to make changes without further notice to this manual and to any modules. Mission Solar Energy does 

not convey any license under its intellectual property rights. Mission Solar Energy assumes no responsibility for any 

infringement to patents or other rights of third parties that may result from use of this manual or related module. 

2.0

 

HANDLING AND USE 

Mission Solar Energy shall not be liable for, and buyer shall indemnify, defend and hold harmless Mission Solar Energy, 

its affiliates and their respective officers, directors, employees, representatives and agents (”indemnities”) from and 

against, any and all claims, losses, liabilities, costs and expenses (including attorneys' fees) (“claims”) arising out of or 

resulting from the handling, use, processing, alteration, distributions, sale or marketing of modules and this manual, or 

any other action or inaction with regard to the modules and this manual, in each case after the delivery thereof to buyer; 

provided however, that buyer shall not be liable to Mission Solar Energy for damages directly caused by the sole 

negligence of Mission Solar Energy. Buyer’s obligations under this section shall survive the termination, cancellations or 

expiration of all orders delivered under these terms and the cessation of any business transaction between Mission Solar 

Energy and buyer. 

3.0

 

LIMITATION OF LIABILITY AND LIMITED REMEDIES 

In no event will Mission Solar Energy be liable to buyer for any lost or prospective profits, indirect, incidental, 

consequential, special, exemplary or punitive damages, including, without limitation, lost earnings, or business 

interruption, whether or not based upon Mission Solar Energy’s negligence, breach of warranty, strict liability, in tort or 

any other cause of action. Buyer’s exclusive remedy VIS-À-VIS Mission Solar Energy or any other cause if action related 

to the modules and this manual is at Mission Solar Energy’s option limited to (i) replacement of the non-conforming 

modules; or (ii) refund to buyer of the portion of the purchase of the purchase price attributable to such non-conforming 

modules. In no event shall Mission Solar Energy’s cumulative liability exceed the price of modules sold which was the 

direct cause of the alleged loss, damage or injury. 

4.0

 

GENERAL INSTRUCTIONS 

This manual provides important safety instructions regarding installation, maintenance and handling of Mission Solar 

Energy photovoltaic modules. All the users should read this manual carefully and follow the instructions strictly. The 

installation of solar modules requires  specialized skills and experience and should only be performed by licensed 

professionals. 

Содержание MSE PERC 60 Series

Страница 1: ...PERC Series ModuleTypes MSExxxSX6S MSExxxSX6W MSExxxSX6Z MSExxxSX5T MSExxxSX5K MSExxxSX5R Module Installation User Manual REV R2 REVISION DATE 1 29 2021...

Страница 2: ...8 0 PRODUCT SPECIFICATION 8 Table 1 Electrical Ratings of MSE PERC 72 6BB White backsheet Module Series 8 Table 2 Electrical Ratings of MSE PERC 72 6BB BLACK Backsheet Module Series 8 Table 3 Electric...

Страница 3: ...eys fees claims arising out of or resulting from the handling use processing alteration distributions sale or marketing of modules and this manual or any other action or inaction with regard to the mo...

Страница 4: ...es with higher light intensity DC voltage of 30 Volts or higher is potentially lethal Contacting the live circuitry of a PV system operating under light can result in lethal electric shock Use insulat...

Страница 5: ...emperatures Minimum ambient air temperatures 40o C 40o F Maximum ambient air temperatures 40o C 104o F 6 2 INSTALLATION CONDITION Orient the module correctly Mount the modules with the junction box in...

Страница 6: ...forks to handle module pallet Do not mark the modules with sharp instruments Unpack the module pallet with care and follow the unpacking steps in this manual Be careful when unpacking transporting an...

Страница 7: ...when cut Eye protection is highly recommended Lift the pallet lid and set it away from unpacking area Using a box cutter carefully cut along the corner from the top to the middle of the box on the pac...

Страница 8: ...individual modules The first module must be separated and pulled out with additional care so as to not scratch the modules Continue removing modules by peeling back tape moving the module forward and...

Страница 9: ...ce 0 3 0 3 0 3 0 3 0 3 Open Circuit Voltage Voc V 48 56 48 71 48 92 49 14 49 28 Short Circuit Current Isc A 10 89 10 93 10 99 11 05 11 09 Rated Voltage Vmp V 39 59 39 73 39 93 40 14 40 27 Rated Curren...

Страница 10: ...ule Peak power C Voltage C Current C NOCT C MSExxxSX6S MSExxxSX6W xxx 405 425 in step of 5W xxx is standing for rated output power at STC 0 359 o C 0 261 o C 0 044 o C 44 69 o C MSExxxSX6Z xxx 405 425...

Страница 11: ...le on a roof or building ensure that it is securely fastened and cannot fall as a result of wind or snow loads Provide adequate ventilation under the module for cooling 10cm minimum air space between...

Страница 12: ...AD BACK OF MODULE DESIGN LOAD Bolt method SX6S SX6W SX6Z 546mm 3600 Pa 1600 Pa SX6R 506mm 3600 Pa 1600 Pa SX5T SX5K 470mm 3600 Pa 1600 Pa Clamp method SX6S SX6W SX6Z 469mm D 546mm 3600 Pa 1600 Pa 469m...

Страница 13: ...of 2000m Artificially concentrated sunlight should not be directed on the module Rated electrical characteristics are within 10 percent of measured values at Standard Test Conditions of 1000 W m2 25 C...

Страница 14: ...when accessed directly from document control directory Printed copies are uncontrolled unless verified against online document COP YR IGHT 2020 M ISSIO N SOL A R EN ER GY LLC ALL R IGHT S R ESERVED R...

Страница 15: ...unding device manufacturer s instructions and be used with a racking system in compliance with UL Outline Standard 2703 where this module has been evaluated with that racking system 10 1 WEEB UIR The...

Страница 16: ...ions with ability to work in a temperature range of at least 40o C and 90o C Install the modules so that water from rain or condensation cannot penetrate inside the cable conduits Fix cables to the st...

Страница 17: ...commends that PV systems be periodically inspected by the installer or other qualified personnel The purpose of the PV system inspection is to ensure that all system components are functioning properl...

Страница 18: ...ions are uncontrolled except when accessed directly from document control directory Printed copies are uncontrolled unless verified against online document COP YR IGHT 2020 M ISSIO N SOL A R EN ER GY...

Отзывы: