![MIOX RIO-S Series Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/miox/rio-s-series/rio-s-series_installation-operation-and-maintenance-manual_1804803008.webp)
MIOX RIO-S Series Operators Manual
102-00130-D
Page
8
System Space Requirements
Space Requirements
Appropriate floor-space must be identified to accommodate the OSG and sufficient working
space clearance (Figure 1-2). The enclosure is 66 in. (1.68m) wide by 56.5 in. (1.43m)
deep by 80.63 in. (2.04m) tall including the pre-installed external plumbing. Front clearance
from the unit must be a minimum of 42 in. (1.07m), and rear clearance must be a minimum
of 33.5 in. (0.85m). Clearance on both sides of the unit must be at least 30 in. (0.76m)
from the outer face of the enclosure. Refer to Figure 2 for a detailed view of clearance
requirements.
Note: Additional floor space will be required for an oxidant storage tank, brine
generator, water softener, brine pressure boost system, and depending on the
installation, salt storage. Additional floor space will also be required for the
injection system and additional booster pumps.
Security
MIOX equipment must be installed in a building or protected structure that provides shelter
from the weather and extreme temperature variances, and which can be locked or
otherwise secured. Physical security is required to ensure that unauthorized persons cannot
access the unit.
Содержание RIO-S Series
Страница 9: ...MIOX RIO S Series Operators Manual 102 00130 D Page 9 Figure 2 RIO S OSG Space Requirements...
Страница 30: ...MIOX RIO S Series Operators Manual 102 00130 D Page 30 Figure 13 External Plumbing Electrical Overview Rear...
Страница 37: ...MIOX RIO S Series Operators Manual 102 00130 D Page 37 Figure 19 Brine Pressure Boost System...
Страница 75: ...MIOX RIO S Series Operators Manual 102 00130 D Page 75 X mg L chlorine concentration Y gph flow...