INSTALLING the RIO-S
Untrained persons should not attempt to
install or operate MIOX equipment.
Securing the Cabinet
The RIO-S OSG is designed with mounting feet and holes for securing the unit to the
floor. While there are no vibrational components that would cause the system to
move, good seismic design practice as well as building codes in some areas require
that the unit be secured to the floor. Concrete anchors or other suitable hardware is
recommended to secure the RIO-S OSG to the floor. Consult local seismic codes for
site-specific requirements.
Plumbing Overview
The RIO-S OSG comes with all system plumbing pre-installed at the factory. The only
connections made by the customer to the generator itself are the water input line, brine
input line, and the oxidant outlet line. The brine and water connections are made via PVC
union connectors (1” for brine, 2” for water) to the large Y-strainers located behind the cell
enclosure close to the ground. The oxidant outlet connects to the third pipe located near the
Y-strainers via a 2” CPVC union. If needed, refer to Figures 4 and 5 for the locations of all
major plumbing components, and below for a summary of the more operator-relevant
components. If additional clarification is needed, contact your MIOX Customer Support
provider.
Содержание RIO-S Series
Страница 9: ...MIOX RIO S Series Operators Manual 102 00130 D Page 9 Figure 2 RIO S OSG Space Requirements...
Страница 30: ...MIOX RIO S Series Operators Manual 102 00130 D Page 30 Figure 13 External Plumbing Electrical Overview Rear...
Страница 37: ...MIOX RIO S Series Operators Manual 102 00130 D Page 37 Figure 19 Brine Pressure Boost System...
Страница 75: ...MIOX RIO S Series Operators Manual 102 00130 D Page 75 X mg L chlorine concentration Y gph flow...