
2
3
3. Insert the cable through the cable gland until the shielding (
2
) makes contact with the
terminals (
3
). Tighten the pressure nut (
4
) until the sealing insert (
5
) forms a small
bulge between the pressure nut and the cable.
4. Check contact of shielding and terminals.
5. Insert all cores of the cable through the ferrite sleeve and, with one turn around the
ferrite sleeve, insert all cores through the ferrite sleeve again.
6. Screw the wires of the interface cable tightly to the terminals as per the terminal
assignment diagrams (see Chapter
7. For the assignment of colors/signals, refer to the operating instructions/data sheet
for the weighing platform. Any unused cables must be properly insulated.
8. When connecting a load receptor using the 4-cable method (weighing platform cable
to be connected has only 4 wires), connect terminal pairs 1 and 2 (EXC+ and SENSE+)
and 5 and 6 (SENSE- and EXC-) using a wire jumper.
9. After completion of the assembly work, use a pressure gauge to check the IP69K
protection. For further information, please contact Minebea Intec Service.
4 Device installation
Combics 1 Series Complete Scales Models CAW1P, CAW1S, CAS1
Minebea Intec
EN-33
Содержание CAS1
Страница 18: ...CAS1G IG Combics 1 Series Complete Scales Models CAW1P CAW1S CAS1 3 Device description EN 16 Minebea Intec ...
Страница 128: ......
Страница 136: ...Typ Waage Minecomb Typ Auswertegerät TA EG Bauartzulassung T11379 Prüfschein D09 11 02 Typ Minecomb ...
Страница 137: ...Typ Waage Minecomb Typ Auswertegerät TA EG Bauartzulassung T11379 Prüfschein D09 11 02 ...
Страница 138: ...Option Y2 Typ Waage Minecomb Typ Auswertegerät TA EG Bauartzulassung T11379 Prüfschein D09 11 02 ...
Страница 140: ...CAW3S1 60FE NCE Typ Waage Minecomb Typ Auswertegerät TA EG Bauartzulassung T11379 Prüfschein D09 11 02 ...
Страница 141: ......
Страница 142: ......
Страница 143: ...1 5 ...
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......