R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
LA
70063-0400
Litho
in
U.S.A.
BMP100018/20121
14B
(Sheet
2
of
3)
Load
Door
Installa
tion
DOOR
LIFT
BRACKET
EYELET
THIMBLE
SLEEVE
HOSE
CABLE
5040T
G2L/R,TS2L/R
5050T
G1L/R,TS1L/R
Removing
Load
Door:
Cut
the
cables
to
the
load
door
,
unthread
the
pulleys
and
lift
the
door
up
and
out
of
the
door
channel.
T
o
save
the
cables,
another
method
is
to
disconnect
the
turnbuckles,
unbolt
and
remove
all
seven
(7)
pulleys,
lift
the
door
up
and
out
of
the
door
channel.
Feed
new
cable
through
eyelet
thimbles
and
sleeves
and
crimp.
Slide
the
pieces
of
1”
braided
hose
down
the
cable
and
over
the
thimbles.
Lower
the
door
into
the
door
channel,
keeping
tension
on
the
cables.
Thread
the
cables
up
through
the
pulleys
as
shown
in
.
When
attaching
cables
to
turnbuckles
or
adjusting
turnbuckles,
make
sure
the
door
is
fully
closed
and
the
cylinder
is
fully
extended.
If
the
pulleys
were
removed,
reinstall
pulleys
as
shown
in
.
Adjust
cable
tension
with
turnbuckles.
Reinstalling
Load
Door:
To
p
V
iew
T
op
V
iew
16
17
18
27
26
25
20
FULL
UP
PHOT
OEYE
23
24
FULL
DOWN
PROXIMTY
SWITCH
21
22
The
6458TG2R
is
shown,
the
5040TG2LR/-
T2SLR
parts
are
similar
.
See
parts
list.
77
Содержание 5050
Страница 2: ......
Страница 8: ......
Страница 9: ...Safety 1 5 ...
Страница 26: ......
Страница 27: ...Service and Maintenance 2 23 ...
Страница 48: ......
Страница 49: ...Covers and Shipping Brackets 3 45 ...
Страница 62: ......
Страница 63: ...Drive Assemblies 4 59 ...
Страница 78: ......
Страница 79: ...Door Assemblies 5 75 ...
Страница 87: ...Air Flow Assemblies 6 83 ...
Страница 102: ......
Страница 103: ...Gas Assemblies 7 99 ...
Страница 114: ......
Страница 115: ...Steam Assemblies 8 111 ...
Страница 120: ......
Страница 121: ...Water Assemblies 9 117 ...
Страница 124: ......
Страница 125: ...Pneumatic Assemblies 10 121 ...