SECTION III
INSTALLATION
OCM II
The OCM II should be mounted in a clean dry area; within the operating temperature range and non-corrosive
to, the electronics and the NEMA 4 polycarbonate enclosure. The enclosure door should be accessible to allow
calibrating and viewing. Refer to Figure 1 for outline and mounting details.
Do not mount the OCM II in direct sunlight
without the use of a sun shield
BATTERY
After mounting the OCM II, open the cover and remove the front panel by loosening the captive thumb screws.
The unit is supplied with one battery package. Remove the battery from the package and insert it into either of
the two battery sockets. The second battery socket is for installing a new battery before removing the old one,
so as not to loose calibration and data logged into the memory.
Do not install the memory back-up battery until
the OCM II is to be powered and put into use.
A battery installed in a non-powered unit will be drained in about one year. Remove the battery during extended
shut down.
TRANSDUCER
Transducer wiring must be done in conjunction with approved conduit, boxes
and fittings and to procedures in accordance with all governing regulations.
All transducer wiring must be run in grounded metal conduit for optimum noise rejection. Ground shield only at
OCM II and insulate shield at junctions to prevent inadvertent grounding.
Refer to Figures 3 & 8 in the back of this manual for wiring information and Figure 5 for general
mounting practices.
1.
Mount the transducer such that it is centered over the flow at a minimum height of 60 cm (2 ft) above the
highest liquid level with its radiating face aimed directly down. "U" parameter drawings depicting transducer
location are for reference only. Refer to the manufacturer of the primary measuring device for the specified
point of head measurement.
2.
Position the transducer such that its sound path is perpendicular to the liquid surface. Noting that the
transducer beam angle is about 12° (6° off vertical or a rise:run of 10:1), care must be taken to position the
transducer such that the sound path to the liquid surface is unobstructed and does not intersect the walls of
the flume or weir.
91/02/14
PL-269
3 – 1
Содержание OCM II PL-269
Страница 1: ...OCM II PROCESS MEASUREMENTS OPEN CHANNEL MONITOR Instruction Manual PL 269 February 1991 33452690 ...
Страница 6: ......
Страница 8: ......
Страница 12: ......
Страница 22: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 76: ......
Страница 78: ......
Страница 92: ...PL 269 9 14 ...
Страница 94: ......
Страница 95: ......
Страница 106: ......