![Millipore direct-q 3 R Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/millipore/direct-q-3-r/direct-q-3-r_user-manual_1796915052.webp)
46
Installation
D
•
Remove the new SmartPak cartridge from its shipping box.
•
Remove the protective caps on the ports of the SmartPak cartridge.
•
Locate the O-rings on the ports. Wet them with water. It is
preferable to wet them with ultrapure water.
•
Install the SmartPak cartridge until it is fully seated into the system
ports as shown (D, E and F).
E
F
•
CLOSE THE FRONT COVER.
G
NOTE:
The Tank Outlet Valve should be left open (G).