![Millipore direct-q 3 R Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/millipore/direct-q-3-r/direct-q-3-r_user-manual_1796915013.webp)
7
Pre Installation
Installation Requirements
Feedwater
Requirements
Type of Feedwater
Potable
Flowrate
≥
40 LPH
Minimum Pressure
≥
0.5 bar
Maximum Pressure
≤
6 bar
Conductivity
< 2000
µ
S/cm
Temperature
5 to 35
°
C
pH
4 - 10
Fouling Index
< 10
Iron
< 0.1 ppm as CaCO
3
Aluminum
< 0.05 ppm as CaCO
3
Manganese
< 0.05 ppm as CaCO
3
Free Chlorine
< 1 ppm
Langelier Saturation Index
< + 0.2
TOC
< 2000 ppb
Feedwater
Connection Needed
Feedwater Piping Connection
1/2 inch Male GAZ, NPTM or BSPM
Reject Flow
Requirement
Drain Capacity
30 LPH
Environmental
Requirements
Indoor Use Only
Storage Temperature
5
°
C < T < 40
°
C
Operating Temperature 5
°
C < T < 40
°
C
Relative Humidity
Should not exceed 80% for temperatures below 31
°
C
Should stay within 50% to 80% between 31
°
C and 40
°
C.
Altitude
< 3000 metres
Installation Category
II
Pollution Degree
2