16
TS571W Installation Instructions
TS571W Installation Instructions
17
Correct
Wrong
Wrong
●
Locate the PRIMARY operator wiring
terminals, and insert the wires into
the corresponding color terminals.
●
Tighten the screw terminals
ensuring the wires are captured
correctly as shown.
Step 3
Step 4
C
GRN
WHT
BAT+
AUTO
CLOSE
RESET
PULL
ST
AGGER
W
ARNING
BAT–
GRN
WHT
BRN
ORG
BRN
ORG
RED
BLK
RED
BLK
COM
COM
CYCL
SAFE
EXIT
SHDW
AUX V+ AUX V-
LOCK V+ LOCK V-
CLOSE EDGE OPEN EDGE
PRIMAR
Y
SECONDAR
Y
LOCK
AUX
SW1
SW2
PUSH
1 2 3 4 5
+
TERM6
GRN
WHT
BAT+
BAT–
GRN
WHT
BRN
ORG
BRN
ORG
RED
BLK
RED
BLK
AUX V+ AUX V-
PRIMAR
Y
SECONDAR
Y
SW1
SW2
TERM6
Battery Power Access
●
Connect the battery power wires:
Red to Red (BAT+) and Black to
Black (BAT–).
CONNECTING THE OPERATOR AND BATTERY
TRANSFORMER OR SOLAR PANEL WIRING INSTALLATION
WARNING
Before digging contact local authorities to locate underground utilities such as electric and gas service.
Step 1
Step 2
●
Locate power outlet and identify wire
path to control box.
●
If installing a solar panel (FM123 sold
separately), see solar panel instruction
manual and skip to Step 3.
●
Note:
If your outlet is outside, use a
weatherproof cover.
●
Along the identified path between outlet and control box, dig a trench to lay the low voltage transformer wire (RB509 sold
separately).
●
Use PVC conduit from the ground up to the control box.
CAUTION: Please
call your power company
before you dig. Failure to
do so could cause injury
or even death.