2
TS571W Installation Instructions
TS571W Installation Instructions
3
S
E
S
F
B
N
N
!
G
L
O
F
G
V
T
S
F
B
S
E
N
!
G
L
O
F
G
T
Minimum 80˚ Open
N
S
F
B
S
E
N
!
G
L
O
F
G
T
N
●
Assemble the gate post bracket sub
assembly as displayed.
●
Attach the gate post bracket
subassembly and gate bracket to the
operator as shown.
●
Disconnect the operator arm from
the gate bracket.
●
While supporting the operator,
swing the gate and operator to the
closed position.
●
Check for recommended
clearances and binding as shown.
●
Ensure that the necessary arm
stroke does not exceed 20 inches.
●
Make adjustments to the
mounting brackets to achieve the
recommended clearances.
TIP:
Turning the pivot bracket over
gives more hole alignment options
for the gate post pivot bracket
assembly.
●
With the gate in the OPEN
position, use clamps to secure
the operator to the gate post and
center cross member of the gate.
●
Ensure that the operator is level.
●
With the operator arm temporarily
secured to the gate, check
to ensure there is at least 2
inches of clearance between
the operator arm and gate. (See
illustration in Step 4 below).
2" Min. - Pinch-Point Clearance
Top View
2" Min.
17" MAX.
2
1
Closed
Position
Open
Position
Step 1
Step 2
Step 3
Step 4
PULL-TO-OPEN OPERATOR MOUNTING (MOST COMMON)
Your Property
PULL-TO-OPEN OPERATOR MOUNTING
Your Property