– The building-under kit is supplied
with its own installation instructions.
– N.B. When built under, drying times
may be longer.
– The electrical socket must be
located in an accessible position
near the appliance.
With niche heights of:
– 830-840 mm, longer screw feet* are
required.
– 870-885 / 915-930 mm, one or two
raising kits* are required.
* Miele accessory available to order
Replacing the lid
If the lid has been removed in order to
fit a coverplate, ensure that, if the lid is
ever replaced, it fits securely into the
rear holders. Otherwise, it is not
properly secure for transport.
Levelling the appliance
The appliance must be perfectly level
to ensure safe and proper operation.
^
The screw feet can be adjusted to
compensate for any unevenness in
the floor.
,
Do not block the gap between
the bottom of the tumble dryer and
the floor with plinth facings, deep
pile carpet etc. This would hinder a
sufficient flow of air to the dryer.
Washer-dryer stack
The tumble dryer can also be
combined with a Miele washing
machine in a washer-dryer stack. The
appropriate "WTV" stacking kit
(available to order) to match your dryer
is required.
* Miele accessory available to order
,
Stacking kits must only be
installed by a suitably qualified fitter.
Installation
45
Содержание T 8626 WP
Страница 57: ...57 ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...M Nr 07 453 630 03 Alteration rights reserved 0509 ...