Service manual
23
8.8
Evacuation
Procedure:
1. Connect the vacuum pump to the charge set’s centre hose.
2. Evacuation for approximately one hour.
§
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the
gauge needle does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
§
Vacuum pump oil, if the vacuum pump oil becomes dirty or depleted, replenish as needle.
Содержание MSE-07CR
Страница 1: ...Cover MSE 07CR MSE 07HR MSE 09CR MSE 09HR MSE 12CR MSE 12HR MSE 18CR MSE 18HR...
Страница 12: ...Service manual 9 5 Refrigerant cycle diagram Cooling only Heat pump mode...
Страница 14: ...Service manual 11...
Страница 15: ...Service manual 12 7 Schematic diagram and Wiring diagram 7 1 Schematic diagram...
Страница 16: ...Service manual 13 7 2 Wiring diagram MSE 07CR MSE 09CR MSE 12CR...
Страница 17: ...Service manual 14 MSE 07HR MSE 09HR MSE 12HR...
Страница 25: ...Service manual 22 discharged...