Service manual
20
§
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
5. Set the 2-way valve to the close position.
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
7. Immediately set the 3-way valve to the closed position.
§
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
8. Disconnect the charge set, and amount the 2-way and 3-way valve’s stem nuts and service port
caps.
§
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m.
§
Be sure to check for gas leakage.
8.6
Re-air purging (Re-installation)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the closed position.
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve.
§
Leave the valve on the charging cylinder closed.
3. Air purging.
§
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45’ for 3 seconds then closing it for 1 minutes; repeat 3 times.
§
After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve.
4. Check the gas leakage.
Содержание MSE-07CR
Страница 1: ...Cover MSE 07CR MSE 07HR MSE 09CR MSE 09HR MSE 12CR MSE 12HR MSE 18CR MSE 18HR...
Страница 12: ...Service manual 9 5 Refrigerant cycle diagram Cooling only Heat pump mode...
Страница 14: ...Service manual 11...
Страница 15: ...Service manual 12 7 Schematic diagram and Wiring diagram 7 1 Schematic diagram...
Страница 16: ...Service manual 13 7 2 Wiring diagram MSE 07CR MSE 09CR MSE 12CR...
Страница 17: ...Service manual 14 MSE 07HR MSE 09HR MSE 12HR...
Страница 25: ...Service manual 22 discharged...