Floor Standing MFM
DM16-01.01.25en
Service manual
26
6.3.5 Re-installation while the indoor unit need to be repaired
1. Collecting the refrigerant into the outdoor unit
Procedure
1). Confirm that both the 2-way and 3-way valves are set to the opened position
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2). Connect the charge hose with the push pin of handle lo to the 3-way valves gas service port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose for 5
seconds and then close it quickly.
4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates
0.1MPa.
6). Set the 3-way valve to the closed position immediately
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
Содержание MFM-24ARN1-Q
Страница 12: ...Floor Standing MFM DM16 01 01 25en Service manual 12 5 2 MFM 48ARN1 R Indoor unit Outdoor unit MOU 48HN1 RB6W...
Страница 13: ...DM16 01 01 25en Floor Standing MFM 13 Service manual 5 3 MFM 60ARN1 R Indoor unit Outdoor unit MOUL 60HN1 R...
Страница 34: ...Floor Standing MFM DM16 01 01 25en Service manual 34 7 2 Control Panel Control Buttons and Functions...
Страница 50: ...Floor Standing MFM DM16 01 01 25en Service manual 50 10 2 9 Overload of current 1...
Страница 52: ...Floor Standing MFM DM16 01 01 25en Service manual 52 10 2 11 Refrigerant Leakage Detection...
Страница 53: ...DM16 01 01 25en Floor Standing MFM 53 Service manual 10 2 12 Temperature protection of compressor discharge...