
PDS-104G PoE Switch
Power Over Ethernet PowerView Pro User Guide
Copyright © 2016
Microsemi
Page 21 of 48
Rev. 1.0
CPG
– PoE BU
One Enterprise Aliso Viejo, CA 92656 USA
Figure
3-14: Automatic Weekly Schedule PoE Port Reset
Automatic Weekly Schedule PoE Port Reset
– main features:
Flexibility on the days that PoE port reset should be done (multiple day combination).
30-minute duration resolution, starting from 30 minutes up to 24 hours.
One or more PoE ports can be re-initialized.
NOTE:
For Automatic Weekly Schedule PoE Port Reset to function properly, an NTP Server must be
configured (see Configuration Web Page) providing correct GMT time.
Please make sure that a green
OK
appears to the right of the unit local time
3.4.3 Advanced Web Page
– Reset Unit Options
The unit supports three different reset options (also available over Telnet)
Figure
3-15: Reset Unit Options
Reset Manager
– Reset only the internal network manager responsible for unit network management
interfaces such as Web (HTTP/HTTPS), Telnet/SSH, SNMP, etc. Internal Ethernet switch will be also
reset (network will be down for a few seconds) leaving PoE power unchanged (powered PD devices will
continue normal operation as if no reset was done).