Quadrus Verifier User’s Manual
3-69
Verification
AIM DPM Verification Process
• Once the reflectance calibration process is complete, place the candidate symbol as
close to the center of the Verifier’s field of view as possible.
• When the candidate symbol is in position, initiate the
AIM DPM Verification
command
<V4>
.
• The
AIM DPM Verification Report
will then appear, detailing the symbol’s adherence
to AIM DPM guidelines.
AIM DPM Verification Report
The
AIM DPM
results show data concerning the reference decode algorithm, cell contrast,
fixed pattern damage, axial and grid non-uniformity, cell modulation, unused error correction,
reflectance, print growth, symbol type, symbol size, element size, and pixels per element. All
but the last five parameters are given a numeric and alphabetical grade.
Serial Cmd:
<
V4
>
Содержание Quadrus Verifier
Страница 1: ...Quadrus Verifier User s Manual P N 83 006702 Rev C ...
Страница 30: ...1 18 Quadrus Verifier User s Manual Generate and Save Verification Report ...
Страница 150: ...4 10 Quadrus Verifier User s Manual UII Parsing ...
Страница 152: ...Quadrus Verifier User s Manual ...
Страница 178: ...5 26 Quadrus Verifier User s Manual Aux Port System Data Status ...
Страница 210: ...6 32 Quadrus Verifier User s Manual Setting Up the Verifier for EZ Trax ...
Страница 302: ...8 62 Quadrus Verifier User s Manual Configuring EZ Trax Output ...
Страница 318: ...9 16 Quadrus Verifier User s Manual New Master Pin ...
Страница 326: ...10 8 Quadrus Verifier User s Manual Service Message ...
Страница 362: ...12 14 Quadrus Verifier User s Manual Request All Database Settings ...
Страница 390: ...14 22 Quadrus Verifier User s Manual Status Requests ...
Страница 404: ...15 14 Quadrus Verifier User s Manual Ordered Output Filter ...
Страница 444: ...A 30 Quadrus Verifier User s Manual Glossary of Terms ...