Video Wall Installation Manual – 6WX1H
Page 7
Rev. 09/2019
Step 1 – Attaching mounting brackets and key measurements
Instructions
Diagrams
•
Remove monitors to be installed from
their cartons and attach the Panel VESA
Brackets (Part D) to back of monitors at
the VESA mounts as shown in figure 1A.
Mounting hardware is provided (Part
H).
Note: If monitor orientation is portrait
mode attach Mounting Brackets to back of
monitors with that orientation.
•
The mounting hardware consists of
various lengths of M6 and M8 screws to
accommodate different manufacturer
specifications.
•
If M6 screws are required, you will
need to use the white M8 sleeves
provided by inserting an M6 screw into
the white sleeve and then attaching
Panel VESA Bracket to back of monitor.
See figure 1B.
Fig. 1A
Fig. 1B
•
Measure the difference between top of
video display panel and bottom of top
mounting bracket as shown in figure
1C.
Distance: _________
This is referred to as measurement A.
Fig. 1C
•
Measure the total height of video
display panel as shown on figure 1D.
Distance: _________
This is referred to as measurement B.
Fig. 1D