Video Wall Installation Manual – 6WX1H
Page 18
Rev. 09/2019
Step 6 –Ensuring Frame Structure is Straight and Plumb
Instructions
Diagrams
IMPORTANT:
It is extremely important the frame
structure is straight along the entire
length of structure and plumb the
entire length down the wall.
Do not push the frame structure
against the wall. The frame
structure is designed to act as the
support structure for the panels
and not the wall itself.
a)
Since almost all walls are not built
straight, you will need to use a laser
level to ensure the frame structure is
straight along the entire length of
structure. See figure 6A.
b)
In the event a portion of horizontal
section needs to be adjusted slightly
inwards or outwards the Wall Brackets
do have a slot to allow for these
adjustments. See figure 6B.
c)
If required, use shims from Shim kit
(Part SK) if further adjustments
required.
d)
Once the frame structure is straight,
plum and level tighten each Bolt to
secure and lock frame the frame in
position.
Fig. 6A
Fig. 6B
Tighten the loose
Screws at Wall
Bracket once
frame is straight
horizontally and
vertically