Video Wall Installation Manual – 6WX1H
Page 11
Rev. 09/2019
•
Slide the Bottom Rail (Part B) into the t-
slot of both the Side Rail (Part S) and
Middle Frame (Part MF) by sliding the
QC connector into the rails from the
bottom. See Figure 3G and 3H.
IMPORTANT: Ensure the Square Nuts
previous inserted in bottom of rails do not
fall out
.
•
Position the Bottom Rail so the distance
between upper part of Top Rail and
centre of Bottom Rail is same as the
measurement C. See figure 3F.
Example:
If measurement C is 30cm, then the
centre of Bottom Rail must be
positioned 30 cm from top of Top Rail.
•
Once in place, tighten the hex bolt that
is on the left side of Bottom Rail using a
6mm hex key (not supplied). Same as
in previous step.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig 3F
Fig. 3G Fig. 3H
•
Verify and adjust rails on Middle Frame
on right side so that all the distances
are exactly the same as those on left
Side Rail. See figure 3J.
•
Once spacing and measurements are
confirm, tighten all the hex bolts on
right hand side of rails to the right Side
Rail.
Fig 3J