Video Wall Installation Manual – 6WX1H
Page 10
Rev. 09/2019
Step 3 – Building Frame Structure
•
Position one of the Top Rails (Part A),
Middle Frame (Part MF), Bottom Rails
(Part B), Side Rail (Part S) as shown in
figure 3A.
•
Slide the Top Rail (Part A) into the t-slot
of the Side Rail (Part S) and Middle
Frame (Part MF) by sliding the QC
connector into the rails. See figure 3B.
IMPORTANT: Ensure the Square Nuts
previously inserted in bottom of rails do
not fall out
.
•
The Top Rail must be positioned the
same distance as measurement A from
the very top of Side Rail. See figure 3D.
Example:
If measurement A is 5cm, then the Top
Rail must be positioned 5 cm from top
of Side Rail.
•
Once in place, tighten the hex bolt that
is on the left side of Top Rail using a
6mm hex key (not supplied). See figure
3C.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig. 3A
Fig. 3B Fig. 3C
Fig 3D