Video Wall Installation Manual – 6WX1H
Page 15
Rev. 09/2019
•
At either end of the video wall
placement, mark the outer most stud
to the finished height of video panels
less 10 cm.
•
Using a laser level mark this reference
point (height) at each stud behind the
video wall. See figure 4C, and 4D.
•
These marks at each stud will be the
used to drill holes for mounting the
Wall Brackets (Part E).
IMPORTANT
All of these Wall Brackets MUST be exactly
the same height!
Fig. 4C Fig. 4D
NOTE
In the event one of the Wall Brackets still
has the tabs attached you will need to break
them off otherwise the tab may interfere
with flush mounting of Wall Bracket to wall
surface.
They can be easily removed using a pair of
pliers or slotted screwdriver.
Refer to diagrams 4E or 4F.
4E) Removal using Pliers
4F) Removal using slotted screw driver