Video Wall Installation Manual – 6WX1H
Page 13
Rev. 09/2019
•
The next section of Top Rail (Part A),
Bottom Rail (Part B), and Side Rail (Part
S) needs to be assembled similar to
previous section assembly. Only
difference is the same Middle Frame
will be used that was used previously.
See figure 3U.
NOTE:
Do not forget that with each Top and
Bottom Rail slide the Square Nut (Part N)
into bottom t-slot for each rail supplied.
See figures 2A and 2B.
•
Insert the following number of Square
Nuts into each top and bottom rail as
indicated below:
Model
Top Rail
Bottom Rail
6W x 1H
2
1
•
The Square Nuts will be loose inside the
rail for time being.
Fig. 3U
IMPORTANT: Ensure the Square Nuts
previous inserted in bottom of rails do not
fall out
.
•
Once each Rail is in place, tighten the
hex bolts that are on the left side of
rails using a 6mm hex key (not
supplied).
•
Verify and adjust rails on the right Side
Rail so that all the distances are exactly
the same as those on Middle Frame on
left side. See figure 3V.
•
Once spacing and measurements are
confirm, tighten all the hex bolts on
right hand side of rails to the right Side
Rail.
Fig. 3V