Page 17
Operation
Industrial Performance Unit
6.4
Setting Up for Initial Use
3DInspect is not ready for measuring tasks when used for the first time. The following steps are required:
Establish the connection to the sensor.
Switch to the
Raw data/Display Image Data
view. Using this view, align the sensor with the target as best as
possible.
Optimize the sensor parameters so that you get an ideal point cloud.
Set the evaluation parameters according to the measuring task at hand.
Set the output parameters. You can find details about control/output via fieldbus in the “Setting Up Fieldbus Opera-
Save the parameters in a parameter set.
You can find more details in the software manual for 3DInspect.
Содержание Industrial Performance Unit
Страница 1: ...Operating Instructions Industrial Performance Unit...
Страница 4: ...Industrial Performance Unit...