![Meyra 1.363 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/meyra/1-363/1-363_operating-manual_1781965030.webp)
30
3. Replace the locking bolt (fig. 40/
➀
).
Caution:
The locking bolt has to be visibly
pushed through.
Mounting the batteries
Mounting is done in reverse order.
1. Set the batteries into the frame
and secure them with the spanning
straps (fig. 41).
Caution:
Make sure that the cables are cor-
rectly routed when mounting the
batteries.
– Danger of cable damage.
2. Reconnect the plugged connections
(fig. 42 + 43).
☞
The plugged connections have to
engage while being connected.
– Conduct a slight pulling test on
the plug.
41
42
43
40
1