
■■■■■■■■■■■■■■■■■■■■■■
4 Start-up
850 Professional IC–Anion – MSM-HC – MCS – LP Gradient
■■■■■■■■
75
4 Setting the contact pressure of the peristaltic pump
NOTE
This work step needs to be performed only if a peristaltic pump is
being used.
■
If peristaltic pumps are used, set the contact pressure
.
5 Rinsing the instrument without columns
■
Rinse the instrument (without columns) with eluent for 5 minutes.
The instrument is now prepared for the installation of the columns
4.2
Conditioning
After the installation and after switching on the instrument, the system
must be conditioned with eluent until a stable baseline is reached.
NOTE
(see Chapter 5.4.2.3, page 80)
tioning time can lengthen considerably.
Conditioning the system
1 Preparing the software
CAUTION
Ensure that the flow set is not higher than the flow permissible for
the corresponding column (see column information sheet and chip
data set).
■
Start the PC program
MagIC Net
.
■
Open the
Equilibration
tab in
MagIC Net
.
■
Select (or create) a suitable method.
Содержание 2.850.2230
Страница 1: ...850 Professional IC Anion MSM HC MCS LP Gradient 2 850 2230 Manual 8 850 8026EN...
Страница 2: ......