![METREL EurotestXC Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/metrel/eurotestxc/eurotestxc_instruction-manual_1779026046.webp)
MI 3152(H)
Eurotest
XC (2,5 kV)
Memory Organizer
46
One or more measurement
result(s) under selected
structure object has failed. Not
all measurements under
selected structure object have
been made yet.
All measurements under
selected structure object are
completed but one or more
measurement result(s) has
failed.
Note:
There is no status indication if all measurement results under each structure element
/sub-element have passed or if there is an empty structure element / sub-element
(without measurements).
5.1.3 Operations in Tree menu
In the Memory organizer different actions can be taken with help of the control panel at the right
side of the display. Possible actions depend on the selected element in the organizer.
5.1.3.1 Operations on measurements (finished or empty measurements)
Figure 5.4: A measurement is selected in the Tree menu
Options
Views results of measurement.
The instrument goes to the measurement memory screen. Refer to chapter
6.1.8