Start-up report 

(METAL FACH Jacek Kucharewicz company's copy) 
 

In order to verify your purchase and warranty validity please send the report on the start-up within 

30 days. You can do it by: 

1. 

E- mailing the scan or photo of the report. 

2. 

Sending a letter with the copy of the report, the company's address can be found at the 
end of the manual. 
 

Boilre room 

Valid 

Invalid 

Comments 

In  compliance  with  the  conditions  of 
chapter  13.  Boiler  room  and  boiler 
installation requirements 

 

 

 

In  compliance  with  the  conditions  of 
chapter  19.  Connecting  the  boiler  to  the 
chimney 

 

 

 

Central heating system 

Valid 

Invalid 

Comments 

In  compliance  with  the  conditions  of 
chapter  15  Connecting  the  boiler  to  the 
heating system 

 

 

 

In  compliance  with  the  conditions  of 
chapter 

17. 

Expansion 

vessel 

requirements 

 

 

 

There is no other heating source. If there 
is, how does it affect the operation of the 
boiler? 

 

 

 

Anti-freeze protection of the boiler 
 

 

 

 

Connecting the components to the 
electrical system 

Valid 

Invalid 

Comments 

The  conditions  are  in  accordance  with 
the 

Operation 

and 

Mainteneance 

Documentation in the chapter: 
18.  Connecting  the  components  to  the 
electrical system. 

 

 

 

Components test 

Valid 

Invalid 

Comments 

The  sensors  are  placed  in  the  correct 
places. 

 

 

 

The readings are in accordance with the 
actual state. 

 

 

 

The fan rotation is correct. 

 

 

 

Opening  the  blower  door  with  blow 
power. 

 

 

 

The screw rotation is correct. 

 

 

 

Boiler start-up 

Valid 

Invalid 

Comments 

The  hydraulic  connection  to  the  system 
is tight. 

 

 

 

Fireman/Strażak system test (if installed) 

 

 

 

Checking  the  connection  between  the 
fuel feeder and boiler. 

 

 

 

Stoking fuel to the fuel bin. 
 

 

 

 

Checking the coal feed by the feeder 

 

 

 

Boiler  start-up  in  accordance  with 
chapter 20. Boiler start-up 

 

 

 

Initial  regulation  of the  boiler  parameters 
settings. 

 

 

 

Final  regulation  of  the  boiler  parameters 
settings. 

 

 

 

 

Personal data given in this form are processed by Jacek Kucharewicz, conducting economic activity 

under  the  company  name  Metal  Fach  Jacek  Kucharewicz,  16-

100  Sokółka,  ul.  Sikorskiego  66,  NIP 

(Taxpayer Identification Number): 545-100-10-62, telephone 48 85 711 94 for the purpose of 
performing the provisions set forth in the guarantee terms  - pursuant to the act of 29 August 1997 on 
personal data protection (consolidated text: Journal of Laws of 2014, item 1182). The User has the right 
to access their personal data, correct them, demand cessation of processing of their personal data, as 
well  as  to  raise  an  objection  against  processing  of  data  in  cases  specified  by  the  law.  Any 
correspondence  concerning  processing  of  personal  data  is  to  be  addressed  to:  Metal  Fach  Jacek 
Kucharewicz, 16-

100 Sokółka, ul. Sikorskiego 66. Providing personal data is voluntary. Pursuant to the 

act  of  29  August  1997  on  personal  data  protection  (consolidated  text:  Journal  of  Laws  of  2014,  item 
1182),  we  hereby  inform that the personal  data  given  in  this form will  be  subject to  protection  against 
access by unauthorized persons. 

Содержание SMART EKO-CARBON Series

Страница 1: ...SMART EKO CARBON OPERATION AND MAINTENANCE DOCUMENTATION ENGLISH TRANSLATION OF THE ORIGINAL MANUAL ISSUE I 2018 04 01...

Страница 2: ...rent norms and standards guaranteeing safety and dependable use Using the device in accordance with the provided manual ensures effective and dependable operation The boiler is not meant to be operate...

Страница 3: ...28 Warranty claim 30 Start up report 32 Start up report 34 List of tables Tab 4 1 Boiler equipment 4 Tab 7 1 Boiler dimentions mm SMART EKO CARBON 6 Tab 8 1 Technical specifications SMART EKO CARBON...

Страница 4: ...on USER The maintenance and operation documentation is a part of the product that comes with the delivered boiler The Operation and Maintenance Documentation contains data concerning the design instal...

Страница 5: ...s 1 ATTENTION The user should thoroughly read the instruction manual of the regulator fan and feeder along as well as the burner ATTENTION METAL FACH reserves the right to implement changes to the par...

Страница 6: ...CARBON 30 180mm does not have a damper The ash pan for waste material from the furnace is situated under the burner The steel door is lined with insulating panels from the inside The boiler is equipp...

Страница 7: ...er dimentions mm SMART EKO CARBON TYPE SMART EKO CARBON 15 SMART EKO CARBON 20 SMART EKO CARBON 25 SMART EKO CARBON 30 A 1270 1270 1310 1310 B 545 545 590 590 C 1300 1350 1350 1450 D 545 615 710 710 E...

Страница 8: ...3 3 3 Maximum working temperature C 95 95 95 95 Test pressure bar 4 5 4 5 4 5 4 5 Boiler class 5 5 5 5 Boiler efficiency 90 90 90 90 Single fuel load L 200 200 200 200 Fuel eco pea coal Power supply...

Страница 9: ...face the exhaust ventilation should be provided by an exhaust duct of 14 x 14 diameter and made from noncombustible material Its outlet should be installed under the ceiling of the boiler room The exh...

Страница 10: ...Boiler installation USER INSTALLER The important element of installation is correct setting and levelling of the SMART EKO CARBON boilers The boilers do not require special base and need to be levele...

Страница 11: ...Easily ignited Asphalt plywood celluloid compound polyurethane polystyrene polyethylene plastics PVC 13 Connecting the boiler to the heating system INSTALLER The connecting of the boiler to the centr...

Страница 12: ...l pipe RB Safety pipe T1 Temperature P1 Pressure Schematic 13 2 Connecting boilers to the heating system diagram Tab 13 2 Symbols applied in the schematics Designation Key T Temperature sensor Tk Boil...

Страница 13: ...6 Heating circle 7 Floor heating 8 Central heating pump CO 9 N 10 N 11 R 12 M 13 P 14 O 15 O 16 P Schematic 13 4 Connecting the boiler to the heating system with Laddomat and buffer 9 Central heating...

Страница 14: ...Preventing heightened pressure Safetly fixtures It includes safety valve manometer and deaerator ATTENTION The boiler installed in the closed system must be equipped with all the safety devices liste...

Страница 15: ...d deaerates the installation The vessel should be installed in the top most point of the installation and if possible vertically above the boiler boilers The capacity of the vessel should be calculate...

Страница 16: ...culation BH upper CT4 buffer temp sensor BL lower CT4 buffer temp sensor WS CT6 P weather temperature sensor FT CT2S flue gas temp sensor TR universal thermostat of mixer open close H outlet for contr...

Страница 17: ...ulated circuit temperature sensor mixer 4 CT4 type RM3 mixer 3 room thermostat RM4 mixer 4 room thermostat FS BU feeder fuel level sensor H2 outlet to the back up boiler control or alarm or hot tap wa...

Страница 18: ...chimney and the closest tree top line should be at least 6m 18 Boiler start up USER INSTALLER ATTENTION The controller settings can be regulated depending on the variety of the existing central heatin...

Страница 19: ...ler do not place any flammable material in the close vicinity of the boiler during ash removal any flammable materials should be kept at a distance of 150 cm from the boiler the ash should be placed i...

Страница 20: ...ling Eye hole sealing Door sealing Feeder sealing Door handle 23 Possible faults and malfunctions USER Before calling the helpline read the FAQ section of the manual ATTENTION Please remember that in...

Страница 21: ...on the flue Check the sealant on the door Regulate the airflow Regulate the controller or call the helpline Why is there grime in the boiler There are few conditions in which grime collects in the bo...

Страница 22: ...tral tap water circuit If the water in the tank is kept below 50o C the bacteria settles The situation is possible to take place when the tank temperature is kept below 50o C or when the taps are rare...

Страница 23: ...ature exceeds 90o C The hold time is too short Cool down the boiler What does the fumes sensor damaged alarm mean It means that the fumes temperature has exceeded 320o C The fumes temperature sensor i...

Страница 24: ...e guidelines given in the appliance s Operation and Maintenance Documentation 5 Performance of first boiler start up within 6 months from the date of the appliance s installation by the fitter in acco...

Страница 25: ...y a specialized company indicated by the Guarantor 6 Performance of the obligations arising from the guarantee will occur within 14 work days counting from the date on which the appliance is made avai...

Страница 26: ...25 Confirmation of performance of inspection guarantee repair maintenance service Item no Date of performance Description of performed activities Contractor s signature and seal 1 2 3 4 5 6 7 8 9...

Страница 27: ...26 10 11 12 13 14 15 16 17 18 19 20...

Страница 28: ...2 Norm PN EN ISO 12100 2012 Safety of machinery Basic concepts principles for design part 1 Basic terminology Methodology 3 Norm PN EN 1708 1 2010 Welding Basic welded joint details in steel Part 1 Pr...

Страница 29: ...ms pursuant to the act of 29 August 1997 on personal data protection consolidated text Journal of Laws of 2014 item 1182 The User has the right to access their personal data correct them demand cessat...

Страница 30: ...29...

Страница 31: ...ty in accordance with the Personal Data Protection Act dated 29 08 1997 Dz Ust No 133 item 883 legible signature of Purchaser The Producer is obligated to take warranty actions within 14 days from rec...

Страница 32: ...31...

Страница 33: ...is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feeder and boiler S...

Страница 34: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Страница 35: ...screw rotation is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feed...

Страница 36: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Страница 37: ...36...

Страница 38: ...METAL FACH JACEK KUCHAREWICZ UL SIKORSKIEGO 66 16 100 SOK KA TEL 48 85 711 94 54 WWW METALFACH COM PL SERVICE INFOLINE CALL US 48 663 453 222 WRITE TO US p czepiel metalfach com pl...

Отзывы: