
16
Schematic 16.2 Electrical schematics for connecting the boiler.
Schematics of electric connections – additional B MODULE,
where
M3- regulated circuit temperature sensor (mixer 3) CT4 type
M4- regulated circuit temperature sensor (mixer 4) CT4 type
RM3- mixer 3 room thermostat
RM4- mixer 4 room thermostat
FS- BU feeder fuel level sensor
H2- outlet to the back-up boiler control or alarm or hot tap water
circulation pump
Relay
L N PE- power supply 230V~
P/M ¾ - mixer pump
SM ¾ - mixer servo
BU - The fuel tank from the bunker to the tank in the boiler
CPU- control
A - ecoMAX 860P2-T controller, module A
Содержание SMART EKO-CARBON Series
Страница 27: ...26 10 11 12 13 14 15 16 17 18 19 20...
Страница 30: ...29...
Страница 32: ...31...
Страница 37: ...36...