Metal-Fach SMART EKO-CARBON Series Скачать руководство пользователя страница 15

 

14 

 

Schematic 14.2 BVTS Valve 

 
The solid fuel boilers with an automatic feeding feature carry very little risk of an uncontrolled 

rise in central heating temperature as the amount of the fed fuel is small. Moreover, in case of a 
sudden temperature rise, the  safety procedure will activate without the user. 

If anything goes wrong, the controller will switch off the feeder for 30 sec in order to remove 

the  ember.  If  after  2  min  from  the  ember  removal,  the  feeder  temperature  does  not  drop,  the 
controller will try again. After four consecutive trials to reach 85

o

C the controller fails to lower the 

feeder temperature, the boiler stops and emergency extinguishing will start. 

The emergency extinguisher, that prevents from combustion of fuel in the tank, can also be 

connected to the water system. In case the set temperature is exceeded, the extinguisher opens 
the water valve and activated regardless of the power supply. 

Thanks  to  the  special  design  of  SMART  EKO-CARBON  series  boilers,  the  risk  of  flame 

penetrating into the fuel dispenser is negligible and is counteracted by: 

 

hermetic design/limit switch protection of the fuel dispenser; 

 

device equalizing pressure between the furnace chamber and fuel dispenser 

 

 

ATTENTION! 

The gas pressure in the expansion vessel should be checked before use and 

properly adjusted. The vessel should be inspected once a year. 

 

 

ATTENTION! 

The safety valve should be installed in the heat source or its closest vicinity e.g 

power cable to the system in an easily accessible spot. 

 

 

ATTENTION! 

The safety valve should prevent the max excessing of work pressure no more than 

10% 

 

15.

 

Requirements for the expansion vessel 

(INSTALLER) 

Every  open  water  heating  installation  should  be  equipped  with  an  expansion  vessel,  which 

receives excess water volume and deaerates the installation. The vessel should be installed in the 
top-most point of the installation, and if possible, vertically above the boiler (boilers). 

The capacity of the vessel should be calculated using the unit capacity for every kW of power at 

1-2 dm 

3

The expansion vessel is equipped in stubs to connect a riser safety tube, safety downpipe, and 

a spill pipe and - connected to it - deaeration. 

The diameter of the deaeration and spill pipe should be at least 

 

 
[MM] 

 

 
- Boiler efficiency [kW] 

The most important requirements on the operation of the device are the following: 

 

The expansion vessel should be about 3.5% of the total water volume in the water heating 
installation and boiler. 

 

Each boiler must have a safety tube and spill-pipe. 

 

Installation  should  be  equipped  with  a  signal  pipe  and  expansion  pipe,  and  a  stub  for 
deaerating the expansion vessel. 

In  the  case  of  several  boilers,  each  should  have  its  own  safety  pipe  in  accordance  with  the 

guidelines  in  PN-91/B-02413.  Safety  and  spill  pipes  should  not have  any  closing  valves,  and  the 
pipes and vessel should be protected from freezing. 
 

16.

 

Connecting the boiler to the power supply 

(INSTALLER) 

The  boiler  is  designed  for  230V/50  Hz  voltage.  Such  connection  should  be  carried  out  by  a 

certified  specialist.  The  230V/10A  connection  socket  with  grounding  should  be  easily  accessible. 
The power supply to the boiler and room lighting should have own circuit.  

The  finishing  and  heating  test  should  be  noted  in  the  Warranty  Card.  the  Warranty  Card 

should  then  be  sent  over  to  the  manufacturer  in  order  for  the  user  to  be  registered  in  the 
company system. 

 

 

ATTENTION! 

First start-up of the boiler must be performed solely by service personnel trained by 

the manufacturer, holding a current Authorized Service Technician or Distributor 

certificate issued by METAL-FACH, or by a person holding an Electrician's license up 

to 1.5 kW. 

 

 

ATTENTION! 

All the pumps, mixers, transmitters, ignition etc. are not parts of the controller 

equipment. 

Содержание SMART EKO-CARBON Series

Страница 1: ...SMART EKO CARBON OPERATION AND MAINTENANCE DOCUMENTATION ENGLISH TRANSLATION OF THE ORIGINAL MANUAL ISSUE I 2018 04 01...

Страница 2: ...rent norms and standards guaranteeing safety and dependable use Using the device in accordance with the provided manual ensures effective and dependable operation The boiler is not meant to be operate...

Страница 3: ...28 Warranty claim 30 Start up report 32 Start up report 34 List of tables Tab 4 1 Boiler equipment 4 Tab 7 1 Boiler dimentions mm SMART EKO CARBON 6 Tab 8 1 Technical specifications SMART EKO CARBON...

Страница 4: ...on USER The maintenance and operation documentation is a part of the product that comes with the delivered boiler The Operation and Maintenance Documentation contains data concerning the design instal...

Страница 5: ...s 1 ATTENTION The user should thoroughly read the instruction manual of the regulator fan and feeder along as well as the burner ATTENTION METAL FACH reserves the right to implement changes to the par...

Страница 6: ...CARBON 30 180mm does not have a damper The ash pan for waste material from the furnace is situated under the burner The steel door is lined with insulating panels from the inside The boiler is equipp...

Страница 7: ...er dimentions mm SMART EKO CARBON TYPE SMART EKO CARBON 15 SMART EKO CARBON 20 SMART EKO CARBON 25 SMART EKO CARBON 30 A 1270 1270 1310 1310 B 545 545 590 590 C 1300 1350 1350 1450 D 545 615 710 710 E...

Страница 8: ...3 3 3 Maximum working temperature C 95 95 95 95 Test pressure bar 4 5 4 5 4 5 4 5 Boiler class 5 5 5 5 Boiler efficiency 90 90 90 90 Single fuel load L 200 200 200 200 Fuel eco pea coal Power supply...

Страница 9: ...face the exhaust ventilation should be provided by an exhaust duct of 14 x 14 diameter and made from noncombustible material Its outlet should be installed under the ceiling of the boiler room The exh...

Страница 10: ...Boiler installation USER INSTALLER The important element of installation is correct setting and levelling of the SMART EKO CARBON boilers The boilers do not require special base and need to be levele...

Страница 11: ...Easily ignited Asphalt plywood celluloid compound polyurethane polystyrene polyethylene plastics PVC 13 Connecting the boiler to the heating system INSTALLER The connecting of the boiler to the centr...

Страница 12: ...l pipe RB Safety pipe T1 Temperature P1 Pressure Schematic 13 2 Connecting boilers to the heating system diagram Tab 13 2 Symbols applied in the schematics Designation Key T Temperature sensor Tk Boil...

Страница 13: ...6 Heating circle 7 Floor heating 8 Central heating pump CO 9 N 10 N 11 R 12 M 13 P 14 O 15 O 16 P Schematic 13 4 Connecting the boiler to the heating system with Laddomat and buffer 9 Central heating...

Страница 14: ...Preventing heightened pressure Safetly fixtures It includes safety valve manometer and deaerator ATTENTION The boiler installed in the closed system must be equipped with all the safety devices liste...

Страница 15: ...d deaerates the installation The vessel should be installed in the top most point of the installation and if possible vertically above the boiler boilers The capacity of the vessel should be calculate...

Страница 16: ...culation BH upper CT4 buffer temp sensor BL lower CT4 buffer temp sensor WS CT6 P weather temperature sensor FT CT2S flue gas temp sensor TR universal thermostat of mixer open close H outlet for contr...

Страница 17: ...ulated circuit temperature sensor mixer 4 CT4 type RM3 mixer 3 room thermostat RM4 mixer 4 room thermostat FS BU feeder fuel level sensor H2 outlet to the back up boiler control or alarm or hot tap wa...

Страница 18: ...chimney and the closest tree top line should be at least 6m 18 Boiler start up USER INSTALLER ATTENTION The controller settings can be regulated depending on the variety of the existing central heatin...

Страница 19: ...ler do not place any flammable material in the close vicinity of the boiler during ash removal any flammable materials should be kept at a distance of 150 cm from the boiler the ash should be placed i...

Страница 20: ...ling Eye hole sealing Door sealing Feeder sealing Door handle 23 Possible faults and malfunctions USER Before calling the helpline read the FAQ section of the manual ATTENTION Please remember that in...

Страница 21: ...on the flue Check the sealant on the door Regulate the airflow Regulate the controller or call the helpline Why is there grime in the boiler There are few conditions in which grime collects in the bo...

Страница 22: ...tral tap water circuit If the water in the tank is kept below 50o C the bacteria settles The situation is possible to take place when the tank temperature is kept below 50o C or when the taps are rare...

Страница 23: ...ature exceeds 90o C The hold time is too short Cool down the boiler What does the fumes sensor damaged alarm mean It means that the fumes temperature has exceeded 320o C The fumes temperature sensor i...

Страница 24: ...e guidelines given in the appliance s Operation and Maintenance Documentation 5 Performance of first boiler start up within 6 months from the date of the appliance s installation by the fitter in acco...

Страница 25: ...y a specialized company indicated by the Guarantor 6 Performance of the obligations arising from the guarantee will occur within 14 work days counting from the date on which the appliance is made avai...

Страница 26: ...25 Confirmation of performance of inspection guarantee repair maintenance service Item no Date of performance Description of performed activities Contractor s signature and seal 1 2 3 4 5 6 7 8 9...

Страница 27: ...26 10 11 12 13 14 15 16 17 18 19 20...

Страница 28: ...2 Norm PN EN ISO 12100 2012 Safety of machinery Basic concepts principles for design part 1 Basic terminology Methodology 3 Norm PN EN 1708 1 2010 Welding Basic welded joint details in steel Part 1 Pr...

Страница 29: ...ms pursuant to the act of 29 August 1997 on personal data protection consolidated text Journal of Laws of 2014 item 1182 The User has the right to access their personal data correct them demand cessat...

Страница 30: ...29...

Страница 31: ...ty in accordance with the Personal Data Protection Act dated 29 08 1997 Dz Ust No 133 item 883 legible signature of Purchaser The Producer is obligated to take warranty actions within 14 days from rec...

Страница 32: ...31...

Страница 33: ...is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feeder and boiler S...

Страница 34: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Страница 35: ...screw rotation is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feed...

Страница 36: ...g the boiler you should remember TECHNICIAN S NAME ADDRESS COMPANY SEAL OWNER S NAME ADDRESS CONTACT NUMBER Training on boiler regulator and combustion control Blower rpm Boiler maintenance chapter 22...

Страница 37: ...36...

Страница 38: ...METAL FACH JACEK KUCHAREWICZ UL SIKORSKIEGO 66 16 100 SOK KA TEL 48 85 711 94 54 WWW METALFACH COM PL SERVICE INFOLINE CALL US 48 663 453 222 WRITE TO US p czepiel metalfach com pl...

Отзывы: