background image

P 1

0619RANE3503FGSD3TW-V1

19MM LOG CABIN, REVERSE APEX, NO EXTRAS, 3.5X3M, FULLY GLAZED SINGLE DOOR, THREE TALL WINDOWS. 

2mm Drill bit

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as 

possible and annually to prevent the timber from deteriorating and to waterproof it. 

This is required to maintain the anti-rot guarantee.

Log Cabins - Are supplied untreated and require a preservative and waterproofing 

treatment.

BUILDING A BASE

When thinking about where the building and base are going to be constructed: 

Ensure that there will be access (60cm) to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your specific product code

For ease of assembly use a 

rubber mallet to fit the log 

boards. Do 

NOT

 use a heavy 

hammer.

Ensure to measure and check before cutting 

boards.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

It is advisable to use a hand 

saw when cutting roof and 

floor boards.

To ensure log boards are even, use a spirit 

level to check each layer has been installed 

correctly.

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

Содержание 0619RANE3503FGSD3TW-V1

Страница 1: ...n as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Log Cabins Are supplied untreated and require a preservativ...

Страница 2: ...w Frame Right Upright 71x70x2065mm QTY 3 AI 0619LOGDUFR V3 Window Frame Top 81x125x808mm QTY 3 AI 0619LOGTWTF V3 Window Frame Bottom 71x70x688mm QTY 3 AI 0619LOGTWBF V3 Window Contents 7 8 9 Fully Gla...

Страница 3: ...0 1X14 ANGLE CUT Fascia 120x12x3532mm QTY 2 S12120 3532 Gable Window Notch 2996mm QTY 1 AI 0619RANE3503FGSD3TW GW Gable 2996mm QTY 1 AI 0619RANE3503FGSD3TW G Main Building Contents 30 31 32 33 Bearer...

Страница 4: ...rer is flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not aligned equally unscrew...

Страница 5: ...nto the frame as shown in the illustration 4x70mm Screws 24 20 22 25 Step 4 Parts Needed No 20 QTY 6 No 22 QTY 6 No 24 QTY 6 No 25 QTY 6 Following the method shown in the illustration lay the first 6...

Страница 6: ...rough the front of the window framing Using the method outlined above assemble three window frames 24x80mm Screws Pre drill hole 80mm screw 5 3 The internal lip of the window frame should be postioned...

Страница 7: ...window frame should be postioned on the inside of the building 11 9 Step 8 Parts Needed No 21 QTY 18 Once you have laid 6 boards off of the starter on the front corner locate one of the assembled wind...

Страница 8: ...e securing it in place Ensure that the boards are level and flush with each other as you lay each one a b a b 21 21 Step 10 Parts Needed No 20 QTY 6 No 25 QTY 6 Once you have positioned the door frame...

Страница 9: ...mes please refer to steps 5 6 Please note This image is for illustrative purposes and may differ from your choice in product regarding door window position Nevertheless the process of fitting the door...

Страница 10: ...to fit parts Step 14 Parts Needed No 22 QTY 1 No 36 QTY 1 Following the method shown in the illustration remaining log boards No 22 36 onto the front and back of the log cabin Ensure that the boards...

Страница 11: ...re fixing screws 26 26 a IMPORTANT Pre drill before fixing screws 26 26 Pre drill hole 70mm screw Step 17 Parts needed No 26 QTY 3 Align the Roof Purlin s No 26 into the cut out slots on each gable to...

Страница 12: ...top of the apex and leave an overhang at the bottom The last board on each side will overhang past the end of the roof purlin Using a straight edge and a pencil mark out a line as a guide Cut along t...

Страница 13: ...crews IMPORTANT Pre drill before fixing screws Pre drill hole 30mm screw Step 21 Parts Needed No 14 QTY 1 No 15 QTY 1 No 16 QTY 1 Fit the Mortice Lock No 15 into the recess in the glazed door No 1 and...

Страница 14: ...w through eachof the floor boards into the floor bearers 248x40mm Screws Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space Closure Trim Internal 35 Measure and cut t...

Страница 15: ...t each side Once the felt is laid out fix to the roof using felt tacks at 100mm intervals Felt size 3624mm X 1000mm 190x Felt Tacks Step 26 Parts Needed No 6 QTY 3 No 12 QTY 1 Attach the Rain Guards N...

Страница 16: ...braces No 34 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building En...

Страница 17: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back SILIC O N E SEA LA N T It is ESSENTIAL...

Отзывы: