Mercia Garden Products 0619RANE3503FGSD3TW-V1 Скачать руководство пользователя страница 13

P 13

Please retain product label and instructions for future reference

             

7

13

Pre drill 

hole

30mm 

screw

Step 20

Parts Needed - No. 7 QTY 1

 

 

   No. 13 QTY 2

Once the roof is fixed, 

place door 

(No.7)

 onto a flat surface and fix 

2xT-hinges 

(No.13) 

to each door using 

5x30mm black screws per hinge.

  

Locate the doors into the door frame on 

the cabin, ensuring there is equal 

spacing on each side between the door 

and door frame.

Secure into position by screwing 

through  the T-hinges 

(No.13)

 using 

4x30mm black screws per hinge, 

 

making sure the doors open & close 

freely without restriction 

*Ensure to screw into the framing and 

not into the channel.

 

18x30mm Black Screws

IMPORTANT: 

Pre-drill before fixing screws.

Pre drill 

hole

30mm 

screw

Step 21

Parts Needed - No. 14 QTY 1

 

 

   No. 15 QTY 1

 

 

   No. 16 QTY 1

 

 

Fit the Mortice Lock (

No.  15

) into the 

recess in the glazed door (

No. 1

) and secure 

using the 2x30mm screws provided. Attach 

the Key Plate (

No. 16

) to the door framing 

with 2x30mm screws.

 

Fit the door handles (

No. 14

) and 

connect with the metal bar to the mortice 

lock using 8x30mm screws. Ensure the lock 

mechanism closes correctly. If not, remove 

the lock and turn the catch around using 

the small grub screw.

*Please note:

 This image is for illustrative 

purposes and may differ from your choice in 

product (

regarding ironmongery

). 

Nevertheless the process of fixing to the 

door(s) is the same.

8x30mm Black Screws

4x30mm Screws

a

b

The Mortice Lock is Reversible

a

b

14

16

15

30mm 

screw

IMPORTANT: 

Pre-drill before fixing screws.

Содержание 0619RANE3503FGSD3TW-V1

Страница 1: ...n as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Log Cabins Are supplied untreated and require a preservativ...

Страница 2: ...w Frame Right Upright 71x70x2065mm QTY 3 AI 0619LOGDUFR V3 Window Frame Top 81x125x808mm QTY 3 AI 0619LOGTWTF V3 Window Frame Bottom 71x70x688mm QTY 3 AI 0619LOGTWBF V3 Window Contents 7 8 9 Fully Gla...

Страница 3: ...0 1X14 ANGLE CUT Fascia 120x12x3532mm QTY 2 S12120 3532 Gable Window Notch 2996mm QTY 1 AI 0619RANE3503FGSD3TW GW Gable 2996mm QTY 1 AI 0619RANE3503FGSD3TW G Main Building Contents 30 31 32 33 Bearer...

Страница 4: ...rer is flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not aligned equally unscrew...

Страница 5: ...nto the frame as shown in the illustration 4x70mm Screws 24 20 22 25 Step 4 Parts Needed No 20 QTY 6 No 22 QTY 6 No 24 QTY 6 No 25 QTY 6 Following the method shown in the illustration lay the first 6...

Страница 6: ...rough the front of the window framing Using the method outlined above assemble three window frames 24x80mm Screws Pre drill hole 80mm screw 5 3 The internal lip of the window frame should be postioned...

Страница 7: ...window frame should be postioned on the inside of the building 11 9 Step 8 Parts Needed No 21 QTY 18 Once you have laid 6 boards off of the starter on the front corner locate one of the assembled wind...

Страница 8: ...e securing it in place Ensure that the boards are level and flush with each other as you lay each one a b a b 21 21 Step 10 Parts Needed No 20 QTY 6 No 25 QTY 6 Once you have positioned the door frame...

Страница 9: ...mes please refer to steps 5 6 Please note This image is for illustrative purposes and may differ from your choice in product regarding door window position Nevertheless the process of fitting the door...

Страница 10: ...to fit parts Step 14 Parts Needed No 22 QTY 1 No 36 QTY 1 Following the method shown in the illustration remaining log boards No 22 36 onto the front and back of the log cabin Ensure that the boards...

Страница 11: ...re fixing screws 26 26 a IMPORTANT Pre drill before fixing screws 26 26 Pre drill hole 70mm screw Step 17 Parts needed No 26 QTY 3 Align the Roof Purlin s No 26 into the cut out slots on each gable to...

Страница 12: ...top of the apex and leave an overhang at the bottom The last board on each side will overhang past the end of the roof purlin Using a straight edge and a pencil mark out a line as a guide Cut along t...

Страница 13: ...crews IMPORTANT Pre drill before fixing screws Pre drill hole 30mm screw Step 21 Parts Needed No 14 QTY 1 No 15 QTY 1 No 16 QTY 1 Fit the Mortice Lock No 15 into the recess in the glazed door No 1 and...

Страница 14: ...w through eachof the floor boards into the floor bearers 248x40mm Screws Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space Closure Trim Internal 35 Measure and cut t...

Страница 15: ...t each side Once the felt is laid out fix to the roof using felt tacks at 100mm intervals Felt size 3624mm X 1000mm 190x Felt Tacks Step 26 Parts Needed No 6 QTY 3 No 12 QTY 1 Attach the Rain Guards N...

Страница 16: ...braces No 34 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building En...

Страница 17: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back SILIC O N E SEA LA N T It is ESSENTIAL...

Отзывы: