P 5
Please retain product label and instructions for future reference
19
19
19
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
24
24
Step 3
Parts Needed - No. 19 QTY 2
No. 24 QTY 2
Place the starter boards (
No’s. 19
) on to assembled base frame along
the longest sides and place the first two log boards
(No. 24)
in the
notch as shown.
Ensure the boards sit square on the base using the same method used
in Step 1. Measure corner to corner, making sure the measurements are
equal.
Once the boards are square, lift up the log board
(No. 24)
and fix the
starterboards in place.
Fix each of the starter boards to the frame by screwing through the
notch into the frame as shown in the illustration.
4x70mm Screws
24
20
22
25
Step 4
Parts Needed - No. 20 QTY 6
No. 22 QTY 6
No. 24 QTY 6
No. 25 QTY 6
Following the method shown in the
illustration, lay the first 6 boards
(No. 20, 22, 24 & 25)
on the back, side,
back corner and one front corner
as
shown in the illustration
Start by placing the front and back
boards, interlocking them with the side
boards. Then place the next side boards,
interlocking with the front and back
boards. Continue this method until you
have placed
6 boards off of the starter
boards on each side,
as shown in the
illustration.
This will create your first level.
*Ensure that the boards are level and
flush with each other as you lay each
one.
**Please Note:
The short boards at the
front/ side of the building (either side of
the door and window opening’s) can be
placed either side depending on your
needs.