background image

P 6

Please retain product label and instructions for future reference

             

Step 5

Parts Needed -  No. 11 QTY 1

 

 

    No. 12 QTY 1

 

 

    No. 13 QTY 1

 

 

    No. 14 QTY 1

Arrange the left, right, top & bottom door 

frames 

(No’s. 11, 12, 13 & 14) 

onto a level 

surface. Secure the top and bottom frames to 

the uprights using 2x80mm screw per corner, 

ensuring the screws do 

NOT

 protrude through 

the front of the door framing.

8x80mm Screws

Pre drill 

hole

80mm 

screw

13

14

11

12

IMPORTANT : 

Pre-drill before fixing screws.

The lip of the door frame should 

be postioned on the inside of 

the building.

14

12

Step 6

Once you have laid 6 log boards (

off of the starter

up the door section, slide the assembled door 

frame over the boards resting the frame on top of 

the starter board 

(if you have not yet assembled 

the door frame refer to step 5)

*Please note:

 This image is for illustrative purposes 

and may differ from your choice in product 

(

regarding door position

). Nevertheless the 

process of fitting the door frame is the same.

**Please Note: 

The short boards at the front of the 

building (either side of the door and window 

opening’s) can be placed either side depending on 

your needs.

Step 7

Parts Needed - No. 25 QTY 6

                                 No. 26 QTY 6

                                 No. 27 QTY 12

                                 No. 29 QTY 12

                                 No. 30 QTY 12

Following the method shown in the illustration, 

lay the next 6 boards (

No. 25, 26, 27, 29 & 30

onto the log cabin to  create your second level.

*Ensure that the boards are level and flush with 

each other as you lay each one. 

25

26

27

30

29

27

29

30

Содержание 0619PNNE0403HGDD3SW-V1

Страница 1: ...rm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to a...

Страница 2: ...m 71x70x805mm Qty 3 AI 0619LOGSWBF V3 7 6 Inch T Hinge QTY 6 PI 07 0113 8 Casement Stay Qty 3 PI 07 0008 Double Door Contents 10 9 11 12 Mortice Lock Qty 1 PI 07 0017 Key Plate Qty 1 Handles Pair Qty...

Страница 3: ...00x2mm 43 Log Board 120x19x2996mm QTY 25 LB19 A 2996 Finisher Board 54x19x4000mm QTY 1 LB19RG54 A 4000 Finisher Board 50x19x4000mm QTY 1 LB19RG50 A 4000 Log Board 120x19x1216mm QTY 12 LB19 B 1216 Log...

Страница 4: ...tal ensuring the bearers are flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not al...

Страница 5: ...No 26 and fix the starter boards in place Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws 24 26 25 26 26 28 28 Step...

Страница 6: ...door section slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 5 Please note This image is for il...

Страница 7: ...Step 9 Once you have laid the second level of boards onto the log cabin slide the windows between the smaller boards and rest on to the longer board if you have not yet assembled the window frames ref...

Страница 8: ...ired to fit parts 70mm screw Step 12 Parts Needed No 22 QTY 2 No 25 QTY 1 No 34 QTY 1 Following the method shown in the illustration place the first boards from the gable No 22 and the remaining Log b...

Страница 9: ...de as shown in the illustration Ensure to stagger the screws so as not to collide with the previous screw 2x70mm Screws 2x30mm Screws Pre drill hole 33 30mm screw Rubber Mallet may be required to fit...

Страница 10: ...oards by 2mm each end You have been issued with 37 roof boards but in reality you may only need to use 36 The last roof board will overhang past the end of the roof purlin Using a straight edge and a...

Страница 11: ...o 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm black screws Ensure the casement stay is centralised on the window Use this method to fit one casement stay to ea...

Страница 12: ...is for illustrative purposes and may differ from your choice in product regarding ironmongery Nevertheless the process of fixing the frames is the same 8x30mm Black Screws 4x30mm Screws a b 30mm scre...

Страница 13: ...h of the floor boards into the floor bearers 280x40mm Screws IMPORTANT Pre drill before fixing screws Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space Closure Trim...

Страница 14: ...ls Felt size 4100mm L X 1000mm W 210x Felt Tacks 1 2 3 45 4 40mm screw Pre drill hole 38 39 38 Step 26 Parts Needed No 38 QTY 2 No 39 QTY 2 Attach the fascia s No 38 39 around the building ensuring to...

Страница 15: ...r building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to damage the log boards 16x60mm Bolt Sets IMPORTANT Pre drill before fixing screws Step 28 Par...

Отзывы: