background image

P 13

Please retain product label and instructions for future reference

             

40mm 

screw

Pre drill 

hole

*

Cut to fit

41

41

Step 22

Parts Needed - No. 41 QTY 35

Place the first floor board (

No. 41

inside the building flush to the log 

board on one side. Continue adding 

the floor boards (

internally

) making 

sure to interlock each individual board.

You have been issued with 35 floor 

boards, but in reality you may only 

need to use 34.

*Do 

NOT

 secure the boards until the 

last board has been measured and 

cut.

Following the same method outlined 

previously measure the gap between 

the bottom of the tongue (

on the last  

board placed

) and the log board.

Using a straight edge mark out the  

measurement onto the last floor board 

(

No. 41

) and cut along the length 

removing the excess.

**Please note:

 Mark the final board 

2mm under the measurement; This will 

allow the timber to expand and contract 

correctly.

Once all the floor boards are in position 

secure each board into position using 

8x40mm screws per board.

***Please Note:

 

Ensure to screw 

 

through each of the floor boards into the 

floor bearers.

280x40mm Screws  

IMPORTANT : 

Pre-drill before fixing screws.

Closure Trim

Internal

23

*Measure and cut the

closure trims to

fit the internal space.

Closure Trim

Internal

43

*Measure and cut the

closure trims to

fit the internal space.

Pre drill 

hole

30mm 

screw

*

trim to fit

Step 23

Parts needed - No. 43 QTY 7

   

 

Inside the building place the closure 

trim (

No. 43

) against the boarding and 

align with the roof as shown in the 

illustration. 

*Measure and cut the closure trims to 

fit the internal space.

Once in position fix each trim into 

place by pre drilling a pilot hole and 

using 6x30mm screws per trim, 

equally spacing them along the face 

of the board.

42x30mm Screws

Roof

Roof

IMPORTANT : 

Pre-drill before fixing screws.

23

23

43

43

30mm 

screw

Pre drill 

hole

*

Cut to fit

Step 24

Parts needed - No. 43 QTY 7

Once the floor has been laid arrange the 

closure trim (

No. 43)

 around the outside 

edge of floor (

internally

), measure and cut 

down accordingly to best match the 

internal space.

Secure each trim section into place using 

6x30mm spaced equally along the board 

as shown in the illustration.

*Do NOT fix the closure trim to the floor

boards.

42x30mm Screws

 

IMPORTANT : 

Pre-drill before fixing screws.

Содержание 0619PNNE0403HGDD3SW-V1

Страница 1: ...rm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to a...

Страница 2: ...m 71x70x805mm Qty 3 AI 0619LOGSWBF V3 7 6 Inch T Hinge QTY 6 PI 07 0113 8 Casement Stay Qty 3 PI 07 0008 Double Door Contents 10 9 11 12 Mortice Lock Qty 1 PI 07 0017 Key Plate Qty 1 Handles Pair Qty...

Страница 3: ...00x2mm 43 Log Board 120x19x2996mm QTY 25 LB19 A 2996 Finisher Board 54x19x4000mm QTY 1 LB19RG54 A 4000 Finisher Board 50x19x4000mm QTY 1 LB19RG50 A 4000 Log Board 120x19x1216mm QTY 12 LB19 B 1216 Log...

Страница 4: ...tal ensuring the bearers are flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not al...

Страница 5: ...No 26 and fix the starter boards in place Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws 24 26 25 26 26 28 28 Step...

Страница 6: ...door section slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 5 Please note This image is for il...

Страница 7: ...Step 9 Once you have laid the second level of boards onto the log cabin slide the windows between the smaller boards and rest on to the longer board if you have not yet assembled the window frames ref...

Страница 8: ...ired to fit parts 70mm screw Step 12 Parts Needed No 22 QTY 2 No 25 QTY 1 No 34 QTY 1 Following the method shown in the illustration place the first boards from the gable No 22 and the remaining Log b...

Страница 9: ...de as shown in the illustration Ensure to stagger the screws so as not to collide with the previous screw 2x70mm Screws 2x30mm Screws Pre drill hole 33 30mm screw Rubber Mallet may be required to fit...

Страница 10: ...oards by 2mm each end You have been issued with 37 roof boards but in reality you may only need to use 36 The last roof board will overhang past the end of the roof purlin Using a straight edge and a...

Страница 11: ...o 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm black screws Ensure the casement stay is centralised on the window Use this method to fit one casement stay to ea...

Страница 12: ...is for illustrative purposes and may differ from your choice in product regarding ironmongery Nevertheless the process of fixing the frames is the same 8x30mm Black Screws 4x30mm Screws a b 30mm scre...

Страница 13: ...h of the floor boards into the floor bearers 280x40mm Screws IMPORTANT Pre drill before fixing screws Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space Closure Trim...

Страница 14: ...ls Felt size 4100mm L X 1000mm W 210x Felt Tacks 1 2 3 45 4 40mm screw Pre drill hole 38 39 38 Step 26 Parts Needed No 38 QTY 2 No 39 QTY 2 Attach the fascia s No 38 39 around the building ensuring to...

Страница 15: ...r building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to damage the log boards 16x60mm Bolt Sets IMPORTANT Pre drill before fixing screws Step 28 Par...

Отзывы: